Topic 10 Commercial Production Quiz

Topic 10 Commercial Production Quiz

12th Grade

30 Qs

quiz-placeholder

Similar activities

Adobe Quiz

Adobe Quiz

9th - 12th Grade

30 Qs

Sustainable Design Quiz

Sustainable Design Quiz

12th Grade

28 Qs

DT Yr 11 exam prep

DT Yr 11 exam prep

10th Grade - University

30 Qs

AO1.4: Media & Design Industry Vocab

AO1.4: Media & Design Industry Vocab

9th - 12th Grade

25 Qs

texas floriculture CDE bank 2021-22 q224-250

texas floriculture CDE bank 2021-22 q224-250

KG - Professional Development

27 Qs

A-Level 3.2.6 Selecting Appropriate tools, equipment & processes

A-Level 3.2.6 Selecting Appropriate tools, equipment & processes

12th Grade

31 Qs

A/V Quiz

A/V Quiz

9th - 12th Grade

34 Qs

A Level DT - 8.3 Modern Manufacturing Methods

A Level DT - 8.3 Modern Manufacturing Methods

9th - 12th Grade

25 Qs

Topic 10 Commercial Production Quiz

Topic 10 Commercial Production Quiz

Assessment

Quiz

Design

12th Grade

Easy

Created by

Stellio Chowrimootoo

Used 4+ times

FREE Resource

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does JIC stand for?

Just in Case

Just in Control

Just in Control

Just in Capacity

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a characteristic of Just in Time (JIT) production?

Large inventory storage

Production based on customer demand

High levels of wasted resources

Fixed production schedules

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a primary disadvantage of JIC?

Higher efficiency

Increased capital costs

Reduced lead time

Less space required

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT a principle of lean production?

Maximizing workflow

Eliminating waste

Increasing inventory

Pulling production from customer demand

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does Kaizen focus on?

Reducing costs

Continuous improvement

Increasing inventory

Maximizing profits

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which element is part of Computer Integrated Manufacturing (CIM)?

Quality assurance

Inventory control

Workflow analysis

Lead time

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are the 'Five S's' in lean production?

Sorting, Stabilizing, Shining, Standardizing, Sustaining

Simplifying, Streamlining, Strengthening, Safeguarding, Sustaining

Selling, Storing, Shipping, Standardizing, Sustaining

Sourcing, Storing, Shipping, Selling, Sustaining

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?

Discover more resources for Design