1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the primary purpose of IGEM/G/11?
To specify gas installation standards
To outline procedures for handling unsafe situations
To regulate the price of gas installations
To provide training requirements for engineers
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following describes an "immediately dangerous" situation under IGEM/G/11?
A gas appliance showing signs of minor wear
A small gas leak outside a building
A situation that poses a serious risk to life or property if gas continues to be used
A disconnected appliance left in a property
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
If an engineer identifies a "Not to Current Standards" (NCS) situation, what action should they take?
Disconnect the appliance immediately
Label the installation as NCS and inform the user
Report the situation to the Health and Safety Executive (HSE)
Take no action
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
According to IGEM/G/11, what label must be applied to an appliance deemed "At Risk" (AR)?
Do Not Use
Not to Current Standards
Faulty Appliance
Requires Immediate Repair
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What should an engineer do if the gas supply cannot be safely restored after an unsafe situation is identified?
Mark the meter as "Do Not Use" and leave the property
Isolate the gas supply and notify the emergency service provider (ESP)
Disconnect all appliances and restore the gas supply
Take no action and leave the property
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is NOT part of the risk assessment process outlined in IGEM/G/11?
Identifying hazards
Determining the gas tariff
Evaluating risks associated with identified hazards
Implementing appropriate control measures
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
How frequently should engineers review the procedures outlined in IGEM/G/11?
Every 6 months
Annually
As part of regular professional development
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?