Project Delivery Methods and Contracts

Project Delivery Methods and Contracts

University

10 Qs

quiz-placeholder

Similar activities

DCB30122 QUIZ

DCB30122 QUIZ

University

15 Qs

Quality, Risk, D&B vs Traditional

Quality, Risk, D&B vs Traditional

University

8 Qs

Risk, Documents, Specifications, EIA

Risk, Documents, Specifications, EIA

University

10 Qs

Civil-Day1

Civil-Day1

University

14 Qs

Contract admin week 3. Tendering

Contract admin week 3. Tendering

University

12 Qs

Quiz on Legal & Statutory Requirements in Construction

Quiz on Legal & Statutory Requirements in Construction

University

7 Qs

Construction Waste Management Quiz

Construction Waste Management Quiz

12th Grade - University

15 Qs

[WEEK 9] LET'S SQUEEZE THE QUIZ

[WEEK 9] LET'S SQUEEZE THE QUIZ

University

10 Qs

Project Delivery Methods and Contracts

Project Delivery Methods and Contracts

Assessment

Quiz

Construction

University

Hard

Created by

Omar Mostafa

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT a typical role of the owner in a construction project?

Paying for the facility

Designing the structure

Setting project requirements

Hiring contractors

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In a traditional Design-Bid-Build (DBB) project delivery method, which sequence is correct?

Construction → Design → Bidding

Design → Bidding → Construction

Bidding → Design → Construction

Bidding → Construction → Design

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary role of the Consultant (Construction Manager) in a project?

Representing the owner on-site

Signing contracts with designers

Acting as a subcontractor

Designing the structure

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which project delivery method combines the design and construction phases under a single contract?

Design-Bid-Build

Design-Build

Construction Management

Lump Sum

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a key disadvantage of the Lump Sum contract type?

High risk for the owner

Low risk for the contractor

Limited flexibility for design changes

Owner must estimate uncertain quantities

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In a Guaranteed Maximum Price (GMP) contract, who bears the cost if the project exceeds the agreed maximum price?

The owner

The contractor

The subcontractor

The consultant

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a key feature of Unit Price contracts?

The total price is fixed before construction

The contractor submits prices per unit of work

The contractor bears all financial risk

Design and construction are done by the same entity

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?