Project Delivery Methods and Contracts

Project Delivery Methods and Contracts

University

10 Qs

quiz-placeholder

Similar activities

ACT - Site Constraints, Ground Investigation

ACT - Site Constraints, Ground Investigation

University

10 Qs

Introduction to Construction Technology and Structural Systems

Introduction to Construction Technology and Structural Systems

University

10 Qs

Week 6 quiz CC & P

Week 6 quiz CC & P

University

15 Qs

CBE113 W1 Terminology recap

CBE113 W1 Terminology recap

University

15 Qs

MTL1 H&S Learner Outcome 1

MTL1 H&S Learner Outcome 1

11th Grade - University

13 Qs

 Drainage - Soil Stack, Gullys, Manholes, Roddings

Drainage - Soil Stack, Gullys, Manholes, Roddings

11th Grade - University

14 Qs

Quiz1

Quiz1

University

8 Qs

Construction Technology Test Week 1-6

Construction Technology Test Week 1-6

University

10 Qs

Project Delivery Methods and Contracts

Project Delivery Methods and Contracts

Assessment

Quiz

Construction

University

Hard

Created by

Omar Mostafa

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT a typical role of the owner in a construction project?

Paying for the facility

Designing the structure

Setting project requirements

Hiring contractors

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In a traditional Design-Bid-Build (DBB) project delivery method, which sequence is correct?

Construction → Design → Bidding

Design → Bidding → Construction

Bidding → Design → Construction

Bidding → Construction → Design

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary role of the Consultant (Construction Manager) in a project?

Representing the owner on-site

Signing contracts with designers

Acting as a subcontractor

Designing the structure

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which project delivery method combines the design and construction phases under a single contract?

Design-Bid-Build

Design-Build

Construction Management

Lump Sum

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a key disadvantage of the Lump Sum contract type?

High risk for the owner

Low risk for the contractor

Limited flexibility for design changes

Owner must estimate uncertain quantities

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In a Guaranteed Maximum Price (GMP) contract, who bears the cost if the project exceeds the agreed maximum price?

The owner

The contractor

The subcontractor

The consultant

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a key feature of Unit Price contracts?

The total price is fixed before construction

The contractor submits prices per unit of work

The contractor bears all financial risk

Design and construction are done by the same entity

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?