Central Heating Systems Components  part 2

Central Heating Systems Components part 2

12th Grade

38 Qs

quiz-placeholder

Similar activities

SISTEM KOPLING SEPEDA MOTOR

SISTEM KOPLING SEPEDA MOTOR

12th Grade

40 Qs

Manufacturing and CNC Programming T1 Q1

Manufacturing and CNC Programming T1 Q1

12th Grade

35 Qs

Basic Maintenance Requirements of Hot Water Systems part 7

Basic Maintenance Requirements of Hot Water Systems part 7

12th Grade

40 Qs

X-SATA FUEL SYSTEM-KONVENSIONAL

X-SATA FUEL SYSTEM-KONVENSIONAL

12th Grade

40 Qs

safe Router operations competence assessment

safe Router operations competence assessment

12th Grade

36 Qs

Water Supply System Requirements

Water Supply System Requirements

12th Grade

36 Qs

Level 2 Plumbing Central Heating

Level 2 Plumbing Central Heating

12th Grade

37 Qs

UTS PMKR XII TKR MONSA

UTS PMKR XII TKR MONSA

12th Grade

40 Qs

Central Heating Systems Components  part 2

Central Heating Systems Components part 2

Assessment

Quiz

Instructional Technology

12th Grade

Medium

Created by

Nahom Sirane

Used 6+ times

FREE Resource

38 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Fill in the blank: A common type of domestic central heating system is ________ heating.

Electric

Gas

Oil

Wood

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

What is the main purpose of the Feed and Expansion (F&E) cistern in an open vented system?

To cool the water

To allow heated water to expand and operate at atmospheric pressure

To filter the water

To heat the water

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

The base of the Feed and Expansion (F&E) cistern should be at the same level as the ______.

hot water tank

cold water storage cistern

boiler

radiator

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the common capacity and color of the feed and expansion (F&E) cistern?

15-litre, white

18-litre, black

22-litre, blue

20-litre, red

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The 22mm open vent from the primaries must rise a minimum of ___ above the water level.

300mm

450mm

500mm

600mm

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is required before the BS 1212 FOV is installed in the F&E?

A service valve

A pressure gauge

A temperature sensor

A flow meter

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The system water will expand by ___ when heated.

2%

3%

4%

5%

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?