1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The first step in soundness testing of rigid pipes is:
Visual inspection
Hydrostatic testing
Ultrasonic testing
Pressure testing
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
After filling the system with water, you should:
Check for leaks
Start the engine
Drain the water
Add more water
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Fill in the blank: Pump system up to 1.5 times the _______ pressure.
maximum
minimum
average
standard
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What should be done if there is a pressure drop during testing?
Increase the pressure immediately
Stop the test and check for leaks
Ignore the pressure drop
Continue testing at lower pressure
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the first step in the soundness testing of plastic pipes (polybutylene)?
Pump system to 1bar
Slowly fill the system with water
Increase pressure to 1.5 times working pressure
Walk around system and check for leaks
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
During Test B, after how many minutes should you inspect the pressure loss initially?
15 minutes
30 minutes
60 minutes
120 minutes
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Fill in the blank: After re-filling the system, open the kitchen tap and allow water to run until clear of ________.
debris/colour
air bubbles
rust
sediment
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?