Phase4mod6tight

Phase4mod6tight

Professional Development

7 Qs

quiz-placeholder

Similar activities

Jupiter's Moon Europa

Jupiter's Moon Europa

4th Grade - Professional Development

11 Qs

Case session #2

Case session #2

Professional Development

12 Qs

Miura D For Immunity & Bones

Miura D For Immunity & Bones

Professional Development

10 Qs

components of food

components of food

KG - Professional Development

10 Qs

NATURAL DISASTERS

NATURAL DISASTERS

KG - Professional Development

10 Qs

Xpert MTB/XDR

Xpert MTB/XDR

Professional Development

10 Qs

Round One: Screening Round

Round One: Screening Round

Professional Development

10 Qs

GENXT OCT 29th

GENXT OCT 29th

Professional Development

10 Qs

Phase4mod6tight

Phase4mod6tight

Assessment

Quiz

Science

Professional Development

Practice Problem

Hard

Created by

Craig Boothright

Used 11+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

7 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The permissible leakage rate for a new gas installation is:

0mb.

1mb.

2mb.

4mb.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the time period that must be allowed for a domestic tightness test?

1 min.

2 mins.

3 mins.

4mins.

3.

FILL IN THE BLANK QUESTION

1 min • 1 pt

If during the initial stages of a tightness test the meter control should be found to be passing gas, what must the gas operative do?

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What equipment must be used to pin point the source of a gas escape?

A U Tube manometer.

An electronic gas detector.

Diluted washing up liquid.

Leak detector solution.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When testing a new installation with air prior to the installation of a gas supply ,it is not necessary to allow 1 minute for stabilisation:

True.

False

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Prior to the domestic tightness test, 1 minute is allowed to check for the meter control passing gas. If this test was not carried out, the consequences could be:

Gas may be escaping through the inlet supply.

The gas pressure could rise within the meter.

Gas that is escaping could be replaced from the supply.

Gas escaping from the service would be recorded.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If when carrying out a tightness test, the readings on each side of a U gauge are 16mb and 20mb, The pressure at which the test is carried out is:

16mb.

20mb.

18mb.

36mb.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?