9.6 Project Management Techniques Quiz

9.6 Project Management Techniques Quiz

10th Grade

20 Qs

quiz-placeholder

Similar activities

CORLANG Week6-7

CORLANG Week6-7

10th Grade - University

20 Qs

UNIT 1.2 MEMORY

UNIT 1.2 MEMORY

10th Grade

19 Qs

B Words GCSE Computer Science

B Words GCSE Computer Science

1st - 10th Grade

15 Qs

After Effect Intoduction

After Effect Intoduction

10th Grade - University

15 Qs

HTML QUIZ # 3

HTML QUIZ # 3

10th Grade

20 Qs

computer Lab Manners

computer Lab Manners

5th - 10th Grade

19 Qs

BIM1014 Quiz 2

BIM1014 Quiz 2

KG - University

15 Qs

Pixlr E Review

Pixlr E Review

10th Grade

16 Qs

9.6 Project Management Techniques Quiz

9.6 Project Management Techniques Quiz

Assessment

Quiz

Computers

10th Grade

Practice Problem

Medium

Created by

Richard Love

Used 5+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary purpose of the Programme Evaluation Review Technique (PERT)?

To allocate resources efficiently

To identify and estimate the time required for project activities

To manage and categorise project stakeholders

To break down the project scope into smaller tasks

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following time estimates is NOT considered in PERT?

Optimistic Time

Most Likely Time

Pessimistic Time

Average Time

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does the Critical Path Analysis (CPA) help identify?

The shortest sequence of tasks

The longest sequence of dependent tasks

The tasks with the most float time

The tasks with the least resources

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In CPA, what is the significance of the critical path?

It can be delayed without affecting the project timeline

It determines the shortest project duration

It identifies tasks with the most resources

It is the path with the most slack time

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main purpose of a Work Breakdown Structure (WBS)?

To manage project stakeholders

To break down the project scope into smaller, manageable tasks

To estimate the time required for project activities

To identify the critical path

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT a benefit of using a WBS?

Improves task clarity and accountability

Ensures nothing is overlooked during project execution

Provides a realistic project timeline based on different scenarios

Makes project budgeting and scheduling easier

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In a RACI matrix, what does the 'R' stand for?

Responsible

Reliable

Resourceful

Receptive

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?