Case Study - Himalayan Mega Dam

Quiz
•
Engineering
•
10th Grade
•
Hard
Jason Rauch
FREE Resource
13 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
3 mins • 1 pt
What is the primary reason for the construction of the Himalayan Mega Dam on the Yarlung Tsangpo River?
To create a tourist attraction in the Tibetan Plateau
To generate over 60 gigawatts of electricity, enhancing China's energy strategy
To improve local transportation infrastructure
To reduce the risk of flooding in the region
Answer explanation
The primary reason for constructing the Himalayan Mega Dam is to generate over 60 gigawatts of electricity, which significantly enhances China's energy strategy, addressing its growing energy demands.
2.
MULTIPLE CHOICE QUESTION
3 mins • 1 pt
Considering the remote location of the Himalayan Mega Dam, what strategic approach is being planned to transport construction materials?
Using only existing roads and pathways
Developing new roads and possibly utilizing aerial delivery systems
Relying solely on local labor to carry materials
Transporting materials via riverboats
Answer explanation
Given the remote location of the Himalayan Mega Dam, developing new roads and possibly using aerial delivery systems is essential for efficiently transporting construction materials, as existing infrastructure may be inadequate.
3.
MULTIPLE CHOICE QUESTION
3 mins • 1 pt
How does the seismic activity in the Himalayan region influence the engineering strategies for the dam's construction?
It requires the use of traditional construction methods
It necessitates advanced seismic design techniques and materials
It has no impact on the construction strategies
It encourages the use of lightweight materials
Answer explanation
The seismic activity in the Himalayan region poses significant risks, necessitating advanced seismic design techniques and materials to ensure the dam's structural integrity and safety during earthquakes.
4.
MULTIPLE CHOICE QUESTION
3 mins • 1 pt
What is a potential environmental impact of the Himalayan Mega Dam project, and how is it being addressed?
Increased tourism; addressed by building more hotels
Habitat loss; addressed by considering the run-of-the-river system
Air pollution; addressed by planting more trees
Noise pollution; addressed by using quieter machinery
Answer explanation
The Himalayan Mega Dam project poses a risk of habitat loss due to its scale. This is being addressed by considering a run-of-the-river system, which minimizes ecological disruption compared to traditional dam designs.
5.
MULTIPLE CHOICE QUESTION
3 mins • 1 pt
Why is the Yarlung Tsangpo River considered significant to the local Tibetan communities?
It is a major source of fish for the communities
It holds spiritual significance
It is the only source of drinking water
It is a popular site for recreational activities
Answer explanation
The Yarlung Tsangpo River is significant to local Tibetan communities as it is regarded as the embodiment of a goddess, holding deep spiritual significance, which influences their culture and beliefs.
6.
MULTIPLE CHOICE QUESTION
3 mins • 1 pt
What is a key sociocultural challenge posed by the construction of the Himalayan Mega Dam?
The introduction of new languages to the region
The potential displacement of communities
The increase in local employment opportunities
The promotion of local cultural festivals
Answer explanation
The construction of the Himalayan Mega Dam poses a key sociocultural challenge due to the potential displacement of communities and alteration of traditional lands, disrupting local cultures and livelihoods.
7.
MULTIPLE CHOICE QUESTION
3 mins • 1 pt
How does the project plan to address the concerns of local Tibetan communities regarding the dam's construction?
By ignoring their concerns and proceeding with construction
By engaging in inclusive decision-making processes
By offering financial compensation without consultation
By relocating the communities to urban areas
Answer explanation
The project plans to address local Tibetan concerns by engaging in inclusive decision-making processes and fostering dialogue, ensuring that community voices are heard and considered in the construction plans.
Create a free account and access millions of resources
Similar Resources on Wayground
15 questions
San Francisco's Transportation Network

Quiz
•
10th Grade - University
15 questions
TOPIC 1-Materials and Prestressing Applications

Quiz
•
University
8 questions
Refresh Memori - Pengenalan Arduino

Quiz
•
11th Grade
10 questions
ENGG. SURVEY QUIZ BCV302 AY 24-25

Quiz
•
10th Grade
15 questions
Post-GBM #1 Quiz

Quiz
•
University
15 questions
Battle of the Bridges

Quiz
•
10th Grade - University
10 questions
Water Resource Management in Selangor

Quiz
•
University
15 questions
Quiz T2_Malaysia Practices on Sustainability

Quiz
•
University
Popular Resources on Wayground
18 questions
Writing Launch Day 1

Lesson
•
3rd Grade
11 questions
Hallway & Bathroom Expectations

Quiz
•
6th - 8th Grade
11 questions
Standard Response Protocol

Quiz
•
6th - 8th Grade
40 questions
Algebra Review Topics

Quiz
•
9th - 12th Grade
4 questions
Exit Ticket 7/29

Quiz
•
8th Grade
10 questions
Lab Safety Procedures and Guidelines

Interactive video
•
6th - 10th Grade
19 questions
Handbook Overview

Lesson
•
9th - 12th Grade
20 questions
Subject-Verb Agreement

Quiz
•
9th Grade
Discover more resources for Engineering
40 questions
Algebra Review Topics

Quiz
•
9th - 12th Grade
10 questions
Lab Safety Procedures and Guidelines

Interactive video
•
6th - 10th Grade
19 questions
Handbook Overview

Lesson
•
9th - 12th Grade
10 questions
Characteristics of Life

Quiz
•
9th - 10th Grade
10 questions
Essential Lab Safety Practices

Interactive video
•
6th - 10th Grade
62 questions
Spanish Speaking Countries, Capitals, and Locations

Quiz
•
9th - 12th Grade
20 questions
First Day of School

Quiz
•
6th - 12th Grade
21 questions
Arithmetic Sequences

Quiz
•
9th - 12th Grade