Case Study - Himalayan Mega Dam

Case Study - Himalayan Mega Dam

10th Grade

13 Qs

quiz-placeholder

Similar activities

Engineering Quiz

Engineering Quiz

12th Grade

10 Qs

Protecting the Water Supply

Protecting the Water Supply

10th Grade - University

15 Qs

Site Supervision Quiz

Site Supervision Quiz

University

15 Qs

Construction Communication Quiz

Construction Communication Quiz

University

14 Qs

TOPIC 1-Materials and Prestressing Applications

TOPIC 1-Materials and Prestressing Applications

University

15 Qs

Tacoma Narrows Bridge

Tacoma Narrows Bridge

10th Grade - University

14 Qs

Topic 3 - Sustainability & Green Technologies

Topic 3 - Sustainability & Green Technologies

University

16 Qs

Post-GBM #1 Quiz

Post-GBM #1 Quiz

University

15 Qs

Case Study - Himalayan Mega Dam

Case Study - Himalayan Mega Dam

Assessment

Quiz

Engineering

10th Grade

Hard

Created by

Jason Rauch

FREE Resource

13 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

What is the primary reason for the construction of the Himalayan Mega Dam on the Yarlung Tsangpo River?

To create a tourist attraction in the Tibetan Plateau

To generate over 60 gigawatts of electricity, enhancing China's energy strategy

To improve local transportation infrastructure

To reduce the risk of flooding in the region

Answer explanation

The primary reason for constructing the Himalayan Mega Dam is to generate over 60 gigawatts of electricity, which significantly enhances China's energy strategy, addressing its growing energy demands.

2.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

Considering the remote location of the Himalayan Mega Dam, what strategic approach is being planned to transport construction materials?

Using only existing roads and pathways

Developing new roads and possibly utilizing aerial delivery systems

Relying solely on local labor to carry materials

Transporting materials via riverboats

Answer explanation

Given the remote location of the Himalayan Mega Dam, developing new roads and possibly using aerial delivery systems is essential for efficiently transporting construction materials, as existing infrastructure may be inadequate.

3.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

How does the seismic activity in the Himalayan region influence the engineering strategies for the dam's construction?

It requires the use of traditional construction methods

It necessitates advanced seismic design techniques and materials

It has no impact on the construction strategies

It encourages the use of lightweight materials

Answer explanation

The seismic activity in the Himalayan region poses significant risks, necessitating advanced seismic design techniques and materials to ensure the dam's structural integrity and safety during earthquakes.

4.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

What is a potential environmental impact of the Himalayan Mega Dam project, and how is it being addressed?

Increased tourism; addressed by building more hotels

Habitat loss; addressed by considering the run-of-the-river system

Air pollution; addressed by planting more trees

Noise pollution; addressed by using quieter machinery

Answer explanation

The Himalayan Mega Dam project poses a risk of habitat loss due to its scale. This is being addressed by considering a run-of-the-river system, which minimizes ecological disruption compared to traditional dam designs.

5.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

Why is the Yarlung Tsangpo River considered significant to the local Tibetan communities?

It is a major source of fish for the communities

It holds spiritual significance

It is the only source of drinking water

It is a popular site for recreational activities

Answer explanation

The Yarlung Tsangpo River is significant to local Tibetan communities as it is regarded as the embodiment of a goddess, holding deep spiritual significance, which influences their culture and beliefs.

6.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

What is a key sociocultural challenge posed by the construction of the Himalayan Mega Dam?

The introduction of new languages to the region

The potential displacement of communities

The increase in local employment opportunities

The promotion of local cultural festivals

Answer explanation

The construction of the Himalayan Mega Dam poses a key sociocultural challenge due to the potential displacement of communities and alteration of traditional lands, disrupting local cultures and livelihoods.

7.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

How does the project plan to address the concerns of local Tibetan communities regarding the dam's construction?

By ignoring their concerns and proceeding with construction

By engaging in inclusive decision-making processes

By offering financial compensation without consultation

By relocating the communities to urban areas

Answer explanation

The project plans to address local Tibetan concerns by engaging in inclusive decision-making processes and fostering dialogue, ensuring that community voices are heard and considered in the construction plans.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?