What is the primary function of a Risk Management Plan?

Quality, Risk, D&B vs Traditional

Quiz
•
Construction
•
University
•
Hard
Emma Coyle
Used 1+ times
FREE Resource
8 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
To identify, assess, and manage project risks
To eliminate all project risks
To track contractor work progress
To monitor financial transactions
2.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
What is a key disadvantage of relying solely on Quality Control (QC) in construction?
It prevents all defects from occurring
It eliminates the need for inspections
It focuses on detecting and fixing defects rather than preventing them
It makes Quality Assurance (QA) unnecessary
3.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
The safety and health plan is a document that includes information to allow for the safe planning and execution of the construction phase. Over how many stages is the plan developed?
1
2
3
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Quality Assurance is
an approach to managing poor workplace attitudes
a project management strategy to assure project success
implementing processes to prevent defects occurring
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the primary purpose of a Safety File in construction projects?
To document financial transactions related to safety investments
To record all accidents and incidents that occurred on site
To provide a step-by-step guide for securing a construction permit
To record health and safety information for the future operation, maintenance, and demolition of a structure
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
RAMS stands for Risk Assessment and
Regulatory and Management Standards
Roadwork and Material Safety
Resource Allocation and Maintenance Strategy
Risk Assessment and Method Statement
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
In a Traditional procurement mechanism, the Contractor has ownership over the design process
True
False
8.
MULTIPLE SELECT QUESTION
1 min • 1 pt
Select all "true" statements as they relate to D&B style contract compared to a Traditional Contract
Improved Collaboration between designers and contractors
Single -point of contact for all the works and a single contract with the Client on a D&B
Contractors prefer Traditional Contracts over D&Bs
The Contractor can use their expertise to contribute to design decisions and improve health and safety / cost
The Client holds more Design Risk in a D&B than a Traditional contract
Similar Resources on Quizizz
10 questions
Project Delivery Methods and Contracts

Quiz
•
University
10 questions
Bidding

Quiz
•
University
13 questions
Planer Safety Test - Test #2

Quiz
•
9th Grade - University
13 questions
PPT 2 KNOWLEGDE CHECKER AND STARTER

Quiz
•
12th Grade - University
10 questions
Kuis Dasar K2 2025

Quiz
•
University
10 questions
Roles of QS at Pre and Post Contract Stage

Quiz
•
University
10 questions
Post-Occupancy Review and In Use - OSHA

Quiz
•
University
9 questions
Quiz on Legal & Statutory Requirements in Construction

Quiz
•
University
Popular Resources on Quizizz
15 questions
Character Analysis

Quiz
•
4th Grade
17 questions
Chapter 12 - Doing the Right Thing

Quiz
•
9th - 12th Grade
10 questions
American Flag

Quiz
•
1st - 2nd Grade
20 questions
Reading Comprehension

Quiz
•
5th Grade
30 questions
Linear Inequalities

Quiz
•
9th - 12th Grade
20 questions
Types of Credit

Quiz
•
9th - 12th Grade
18 questions
Full S.T.E.A.M. Ahead Summer Academy Pre-Test 24-25

Quiz
•
5th Grade
14 questions
Misplaced and Dangling Modifiers

Quiz
•
6th - 8th Grade