Quiz on Procurement Systems in Construction

Quiz on Procurement Systems in Construction

University

17 Qs

quiz-placeholder

Similar activities

ITE 2-- MODULE 3 and 4

ITE 2-- MODULE 3 and 4

University

20 Qs

FIU Bridge Collapse Questions

FIU Bridge Collapse Questions

University

17 Qs

Advanced Geotechnical Analysis And Design

Advanced Geotechnical Analysis And Design

University

15 Qs

FORENSIC ENGINEERING

FORENSIC ENGINEERING

University

12 Qs

GREEN ECONOMY

GREEN ECONOMY

University

15 Qs

Introduction to IBS

Introduction to IBS

University

16 Qs

Lalaland Test

Lalaland Test

University

20 Qs

QUIZ 1

QUIZ 1

University

15 Qs

Quiz on Procurement Systems in Construction

Quiz on Procurement Systems in Construction

Assessment

Quiz

Other

University

Hard

Created by

Albert Einstein

Used 2+ times

FREE Resource

17 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

What is the primary focus of the Traditional Method in procurement?

Client's direct management of construction

Involvement of multiple contractors

Rigid separation of design and construction

Fast-tracking projects

2.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Which procurement method includes the entire completed package, including fixtures and fittings?

Management Contracting

Turnkey

Design & Build Method

Traditional Method

3.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

What is a key characteristic of construction projects?

They are managed by a single organization

They involve repetitive tasks

They produce unique products

They are always completed on time

4.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Which procurement method is suitable for fast-track projects?

Management Contracting

Turnkey

Design & Build Method

Traditional Method

5.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

What does the Procurement Triangle illustrate?

The stages of project management

The relationship between time, cost, and quality

The roles of different contractors

The types of construction projects

6.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

In which procurement method does the contractor assume full responsibility for the project?

Management Contracting

Partnering

Turnkey

Design & Build Method

7.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

What is a characteristic of the Construction Management approach?

The client has no involvement

It requires constant client involvement

It is suitable for inexperienced clients

It guarantees fixed pricing

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?

Discover more resources for Other