1.
MULTIPLE SELECT QUESTION
45 sec • 1 pt
Who is responsible for maintaining the PMS records onboard?
Fleet Superintendent
Shipboard management team
Fleet Manager
Classification Society
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the maximum period a Chief Engineer can postpone a non-critical PMS work order using the Shipsure postponement function?
15 days
30 days
45 days
90 days
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Under what condition can a PMS item be rescheduled beyond its original schedul
Automatically by the Chief Engineer
With approval from the Fleet Superintendent
Only during dry dock
With approval from the vessel owner
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What should be done if a vessel’s trading pattern restricts maintenance availability
Ignore the maintenance schedule
Advise the Fleet Superintendent of the anticipated workload
Wait until the next port call
Cancel the maintenance plan
5.
MULTIPLE SELECT QUESTION
45 sec • 1 pt
What is an example of an extraordinary reason for extending a PMS schedule
Crew fatigue
Necessity for a dry dock
Lack of spare parts on board
Routine operational delays
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Who has the overriding authority to call a local repairer for critical defects?
The Chief Engineer
The Fleet Superintendent
The Master
Owner
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Within how many hours must a defect be reported to the office via Shipsure?
12
24
48
72
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?