1.

FILL IN THE BLANK QUESTION

20 sec • 1 pt

A written authorization granted by the Building Official to an applicant allowing him to proceed with construction of a specific project after plans, specifications and other pertinent documents.

2.

OPEN ENDED QUESTION

20 sec • 1 pt

Duly signed and sealed by the corresponding professionals and the plans and specifications shall be submitted together with the duly notarized application for building permit.

Evaluate responses using AI:

OFF

3.

OPEN ENDED QUESTION

20 sec • 1 pt

How many bags of 40kg of cement (Class AA mixture), gravel and sand needs to construct column with a dimensions 2mx1.5mx0.5m?

Evaluate responses using AI:

OFF

4.

FILL IN THE BLANK QUESTION

20 sec • 1 pt

These are written documents that do not include cost, quantity or drawn information.

5.

FILL IN THE BLANK QUESTION

20 sec • 1 pt

This section in Prescriptive Specification will describe, in detail, the materials and their structural and performance requirements.

6.

MULTIPLE SELECT QUESTION

20 sec • 1 pt

Give two rough cost estimate method for building?

Per unit number

plinth area basis

cube rate estimate

per unit length

7.

FILL IN THE BLANK QUESTION

20 sec • 1 pt

What is the specified concrete covering (in mm) for cast against and permanently in contact with ground?

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?