9 questions
Show all answers
1.
FILL IN THE BLANKS QUESTION
20 sec • 1 pt
A written authorization granted by the Building Official to an applicant allowing him to proceed with construction of a specific project after plans, specifications and other pertinent documents.
(a)
2.
OPEN ENDED QUESTION
20 sec • 1 pt
Duly signed and sealed by the corresponding professionals and the plans and specifications shall be submitted together with the duly notarized application for building permit.
Evaluate responses using AI:
OFF
3.
OPEN ENDED QUESTION
20 sec • 1 pt
How many bags of 40kg of cement (Class AA mixture), gravel and sand needs to construct column with a dimensions 2mx1.5mx0.5m?
Evaluate responses using AI:
OFF
4.
FILL IN THE BLANKS QUESTION
20 sec • 1 pt
These are written documents that do not include cost, quantity or drawn information.
(a)
5.
FILL IN THE BLANKS QUESTION
20 sec • 1 pt
This section in Prescriptive Specification will describe, in detail, the materials and their structural and performance requirements.
(a)
6.
MULTIPLE SELECT QUESTION
20 sec • 1 pt
Give two rough cost estimate method for building?
Per unit number
plinth area basis
cube rate estimate
per unit length
7.
FILL IN THE BLANKS QUESTION
20 sec • 1 pt
What is the specified concrete covering (in mm) for cast against and permanently in contact with ground?
(a)
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Microsoft
or continue with
%20(1).png)
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?