Search Header Logo

Masonry

Authored by undefined undefined

Other

8th Grade

Used 7+ times

Masonry
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

5 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1. Why is there a requirement for considering the size of the given work before its accomplishment?

A. To determine the materials needed.

B. To avoid or minimize the waste of resources.

C. To be able to know the total expenses.

C. To be able to know the total expenses.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

2. If the space of two posts is 5 meters, how many pieces of a concrete hollow block are needed for 2 layers where each CHB is 0.40 m?

A. 10 pcs.

B. 12.5 pcs.

C. 25 pcs.

D. 25.5 pcs.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

3. Which of the following does not only tell the magnitude but also the direction?

A. Mensuration

B. Conversion

C. Scalar quantity

D. Vector quantity

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

4. Which of the following measuring tools is used to measure length or distance, width and height?

A. Pull-push-rule

B. Tape measure

C. Spirit level

D. Rule

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

5. What is the length of a CHB?

A. 16 ft

B. 16 in

C. 16 m

D. 16 cm

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?