
Masonry
Authored by undefined undefined
Other
8th Grade
Used 7+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
5 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
1. Why is there a requirement for considering the size of the given work before its accomplishment?
A. To determine the materials needed.
B. To avoid or minimize the waste of resources.
C. To be able to know the total expenses.
C. To be able to know the total expenses.
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
2. If the space of two posts is 5 meters, how many pieces of a concrete hollow block are needed for 2 layers where each CHB is 0.40 m?
A. 10 pcs.
B. 12.5 pcs.
C. 25 pcs.
D. 25.5 pcs.
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
3. Which of the following does not only tell the magnitude but also the direction?
A. Mensuration
B. Conversion
C. Scalar quantity
D. Vector quantity
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
4. Which of the following measuring tools is used to measure length or distance, width and height?
A. Pull-push-rule
B. Tape measure
C. Spirit level
D. Rule
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
5. What is the length of a CHB?
A. 16 ft
B. 16 in
C. 16 m
D. 16 cm
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?