Energy and Power Part 2

Energy and Power Part 2

11th Grade

27 Qs

quiz-placeholder

Similar activities

AE - PLTW - 1.2B Physics of Flight

AE - PLTW - 1.2B Physics of Flight

11th Grade

22 Qs

Reglamento del Aprendiz SENA

Reglamento del Aprendiz SENA

11th Grade

25 Qs

Sistem Kendali Industri XI Genap

Sistem Kendali Industri XI Genap

11th Grade

25 Qs

Titrasi Netralisasi dan Argentometri

Titrasi Netralisasi dan Argentometri

11th Grade

25 Qs

3.4.1 - Reverse Engineering

3.4.1 - Reverse Engineering

10th Grade - University

25 Qs

công nghệ ôn cuối kì 1

công nghệ ôn cuối kì 1

4th Grade - University

27 Qs

LEAN Manufacturing

LEAN Manufacturing

9th - 12th Grade

26 Qs

Engineering Design Process Quiz

Engineering Design Process Quiz

11th Grade

22 Qs

Energy and Power Part 2

Energy and Power Part 2

Assessment

Quiz

Engineering

11th Grade

Medium

CCSS
RI.9-10.4, RI.11-12.5, RL.11-12.2

+30

Standards-aligned

Created by

Thomas Gonzales

Used 3+ times

FREE Resource

27 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1.      According to data from the U.S. EIA, since 2010, natural gas generation, measured in kilowatt-hours,  ___________.

Continually increased

Continually decreased

Stayed at the same level

Trended up and down

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1.      Energy and electricity are critical resources that enable communities to provide __________

clean water

healthcare

education

all responses are correct

Tags

CCSS.RI.7.2

CCSS.RI.8.2

CCSS.RL.11-12.2

CCSS.RL.8.1

CCSS.RL.9-10.2

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

___________is a nonrenewable resource.

Natural gas

Wind power

Geothermal

Solar power

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A monopoly is ___________.

The ownership model for cooperative utilities.

The vertical integration of privately owned utility businesses.

A law that restricted ownership of an electric business by non-utility corporations.

An enterprise that is the only seller of a good or service.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

_____________________ are businesses owned by member-owners.

Independent power producers

Investor-owned utilities

Municipal utilities

Cooperatives

Tags

CCSS.RI.11-12.5

CCSS.RI.6.5

CCSS.RI.7.5

CCSS.RI.8.5

CCSS.RI.9-10.5

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Long wait times in the interconnection queue for access to the grid transmission network _________________.

Cause grid congestion to increase.

Slow down decarbonization because solar and wind power can’t be built quickly.

Are caused by extreme weather events related to climate change.

Are a preventative maintenance response to public power safety shutoffs and wildfires.

Tags

CCSS.RI. 9-10.2

CCSS.RI.11-12.2

CCSS.RL.11-12.2

CCSS.RL.8.2

CCSS.RL.9-10.2

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

_____________ maintenance means that equipment and circuits are inspected and serviced regularly, following recommended and required procedures.

Job hazard

Preventative

Reactive

Condition-based

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?