Theory and Practice 2

Theory and Practice 2

University

100 Qs

quiz-placeholder

Similar activities

BSME SET#1

BSME SET#1

University

100 Qs

CPE12 Final Exam

CPE12 Final Exam

University

100 Qs

Software Process Quiz

Software Process Quiz

University

100 Qs

MPE I - Unit 4

MPE I - Unit 4

University

96 Qs

UNIDAD 2

UNIDAD 2

University

100 Qs

Tools and Equipment Identifier

Tools and Equipment Identifier

9th Grade - University

96 Qs

MCQ Exam - CO3

MCQ Exam - CO3

University

100 Qs

Python Quiz 1

Python Quiz 1

University

100 Qs

Theory and Practice 2

Theory and Practice 2

Assessment

Quiz

Engineering

University

Practice Problem

Hard

Created by

Sangguniang Libueg

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

100 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Upon issuing the required standards for Certificate of Instrument Registration for Global Positioning System (GPS) Receiver, the receiver at static survey, regardless of single or dual frequency, shall have the minimum horizontal accuracy of?

a. 5 mm+1 ppm, multiply by baseline length

b. 10 mm+ 1 ppm, multiply by baseline length

c. 20 mm+1 ppm, divided by baseline length

d. 20 mm+ 1 ppm, multiply by baseline length

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The following survey forms for registration and other purposes shall be drawn on LMB prescribed format, these forms are required for forms evaluation EXCEPT

a. Field Notes

b. Survey Plans

c. Tax Declaration

d. Computation Sheets

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Since the LIMs are prepared under the PTM/PRS-92 coordinate and projection system, what will happen to surveys for projection that is not on that PRS-92 coordinate system

a. These surveys shall be considered as void/invalid and will be disregarded

b. These surveys shall be accepted and transformed with respect to PRS 92

c. These surveys shall be returned to the Geodetic Engineer for re-surveying

d. These surveys shall be first transformed to the proper coordinate system 

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

These shall be used in order to classify and identify all kinds of surveys which facilitate the recording, filing and record keeping of survey plans and maps and their corresponding survey returns.

a. Survey Symbols & Letters

b. Survey Figures & Numbers

c. Survey Symbols & Numbers

d. Survey Figures & Symbols

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The assignment of this one-letter suffix letter shall be confined to the Cadastral Survey meaning, it indicates that the survey was conducted by a Geodetic Engineer in private practice.

a.G

b. D

c. E

d. P

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

6. The following procedure shall apply in the cancellation of approved survey plan EXCEPT

a. There is a request for cancellation by a private party

b. The RED concerned shall issue an Order of Investigation

c. The request should be under oath.

d. An investigation/ground verification shall be conducted

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

This new survey symbol stands for “Free Patent Application”

a. F

b. Fpa

c. Fp

d. Pa

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?