Prelim, Prime Cost, Prov Sum and Pro Rata

Prelim, Prime Cost, Prov Sum and Pro Rata

9th Grade

10 Qs

quiz-placeholder

Similar activities

Pre-fabrication system

Pre-fabrication system

University

10 Qs

Quiz on Quantity Surveying

Quiz on Quantity Surveying

University

10 Qs

MIB Architecture

MIB Architecture

University

13 Qs

Construction Code Quiz

Construction Code Quiz

10th Grade

10 Qs

Standard of Professional Practice

Standard of Professional Practice

University

10 Qs

Embodied Energy in Construction

Embodied Energy in Construction

University

12 Qs

Green Building Index (GBI)

Green Building Index (GBI)

University

15 Qs

Pont Alexander III

Pont Alexander III

University

10 Qs

Prelim, Prime Cost, Prov Sum and Pro Rata

Prelim, Prime Cost, Prov Sum and Pro Rata

Assessment

Quiz

Architecture

9th Grade

Hard

Created by

Cikgu Wan

Used 1+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

"Cost of administering a project, and providing general

plant, site staff, site facilities and site-based services and

other items which are not included in the rates."

Explanation above is best describing...

Preliminaries

Prime Cost

Provisional Sum

Construction Cost

Pro rata

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

"Allocation of costs, benefits,

or resources based on a proportionate share. It's used in

construction projects that involve multiple companies."

Explanation above is best describing...

Preliminaries

Prime Cost

Provisional Sum

Construction Cost

Pro rata

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

"Costs of construction works or

services executed by a nominated sub-contractor, a government or a

statutory authority or for materials or goods to be obtained from a

nominated supplier"

Explanation above is best describing...

Preliminaries

Prime Cost

Provisional Sum

Nominated Cost

Pro rata

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

"Costs estimated in tender document, without certain figures, hence

cost will be provided as lump sum.

Explanation above is best describing...

Preliminaries

Prime Cost

Provisional Sum

Tender Cost

Pro rata

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Preliminaries costs are also known as overheads cost

TRUE

FALSE

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Prime Cost (PC) are normally estimated in tender document, without certain figures, hence lump

cost will be provided as lump sum, calculated by cost consultant.

TRUE

FALSE

7.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Which of the followings are included in Preliminaries cost?

Tower crane

Scaffolding

Temporary road

Portland cement

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?