Mass Production Flow Charts Quiz

Mass Production Flow Charts Quiz

8th Grade

15 Qs

quiz-placeholder

Similar activities

GCSE D&T Unit 1 - Production Techniques and Systems

GCSE D&T Unit 1 - Production Techniques and Systems

8th Grade

11 Qs

Year 9 Graphic Design Quiz 2

Year 9 Graphic Design Quiz 2

6th - 8th Grade

20 Qs

Timber

Timber

6th - 12th Grade

18 Qs

GCSE D&T Unit 5 - Social and Economic Challenge

GCSE D&T Unit 5 - Social and Economic Challenge

8th Grade

15 Qs

Year 7 Identity Homework 2

Year 7 Identity Homework 2

8th Grade

10 Qs

Y8 Learning Block 1

Y8 Learning Block 1

8th Grade

10 Qs

Scales of Production

Scales of Production

8th - 10th Grade

20 Qs

DT GCSE: Use of Technology in design

DT GCSE: Use of Technology in design

6th - 8th Grade

18 Qs

Mass Production Flow Charts Quiz

Mass Production Flow Charts Quiz

Assessment

Quiz

Design

8th Grade

Hard

Created by

P Dixon

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who is considered the father of modern mass production?

Alexander Graham Bell

Nikola Tesla

Henry Ford

Thomas Edison

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main purpose of planning in mass production?

To show how the solution will be made on a mass production line

To increase the cost of production

To make the design process more complex

To reduce the number of workers

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was the first mass production line set up to produce?

Radios

Model T cars

Light bulbs

Televisions

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many people are required to smooth the edges of the clock face?

One person

Two people

Three people

Four people

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What happens if a product fails the quality check after the numbers are set on the clock face?

It is given away for free

It is placed in the recycle bin

It is sent back for more accurate shaping and smoothing

It is sold at a discount

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the total time required to assemble the clock face and mechanism?

33 minutes

30 minutes

25 minutes

20 minutes

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a critical control point in the context of quality control?

A point where the product is packaged

A point where the product is marketed

A point where the product is checked for quality

A point where the product is shipped

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?