Search Header Logo

Construction Basics Quiz

Authored by Richard Abbotts

Professional Development

12th Grade

Construction Basics Quiz
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

32 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of a work schedule in construction?

To ensure workers arrive on time

To plan the sequence and duration of tasks for each trade

To allocate wages to workers

To list the tools needed for the job

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does a site plan typically show?

The internal layout of a building

The full extent of the site, including boundaries and key features

A 3D drawing of the final construction

Manufacturer instructions for appliances

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of a schematic drawing?

To show realistic images of a building

To provide a simplified representation using symbols to show system components

To provide a step-by-step guide to installation

To show the final aesthetic appearance of a project

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does a scale of 1:50 on a drawing mean?

The drawing is 50 times larger than the actual size

The drawing is 50 times smaller than the actual size

1 unit on the drawing equals 50 units in reality

50 units on the drawing equals 1 unit in reality

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is it important to follow manufacturer instructions when installing an appliance?

To ensure correct and safe installation

To make the installation process faster

To avoid using tools incorrectly

To prevent customer complaints

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which type of drawing is most commonly used to show the layout of rooms in a building?

Schematic drawing

Site plan

Floor plan

Elevation drawing

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Before cutting into a floorboard, what is the first thing you should do?

Set the depth of the circular saw

Remove any nails securing the floorboard

Check for hidden pipes and cables using a detector

Mark out where the cut will be made

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?

Discover more resources for Professional Development