Programming and Logic

Programming and Logic

9th Grade

11 Qs

quiz-placeholder

Similar activities

Programming & Interface Week 1B

Programming & Interface Week 1B

9th - 12th Grade

15 Qs

2.3.3 Multiplexers (MUX) and Demultiplexers (DEMUX)

2.3.3 Multiplexers (MUX) and Demultiplexers (DEMUX)

9th Grade

8 Qs

DAGITAB L&C Quiz

DAGITAB L&C Quiz

9th - 12th Grade

10 Qs

Ring Leader: Lesson 2

Ring Leader: Lesson 2

9th Grade - University

11 Qs

Automatización de Procesos Industriales

Automatización de Procesos Industriales

9th Grade

15 Qs

Unit I: Engineering Introduction

Unit I: Engineering Introduction

9th - 12th Grade

15 Qs

KUIZ K2 (1)

KUIZ K2 (1)

9th - 12th Grade

10 Qs

Electronics (10 Questions)

Electronics (10 Questions)

9th Grade

10 Qs

Programming and Logic

Programming and Logic

Assessment

Quiz

Engineering

9th Grade

Medium

Created by

Gerald Allison

Used 1+ times

FREE Resource

11 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In ladder logic programming, what does a normally closed contact represent?

A contact that passes power when its corresponding bit is 0

A contact that passes power when its corresponding bit is 1

A contact that stores energy

A contact that delays signal transmission

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the output of the Boolean expression (A AND B) OR (NOT A AND C) when A=1, B=0, and C=1?

0

1

Undefined

Neither 0 nor 1

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What programming structure would you use to repeat a sequence of operations until a specific condition is met?

If-then statement

Case statement

Loop structure

Subroutine

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In sequential function chart programming, what element represents a stable state where actions can be performed?

Transition

Step

Action

Branch

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which statement about structured text programming is correct?

It is a graphical programming language

It resembles traditional text-based programming languages

It cannot be used with PLCs

It is the same as ladder logic

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a key characteristic of a PLC scan cycle?

It processes inputs and outputs simultaneously

It processes all logic in a non-sequential manner

It sequentially reads inputs, executes logic, and updates outputs

It updates outputs before reading inputs

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does the timer instruction TON represent in ladder logic?

Timer Off Delay

Timer On Delay

Timer Off No delay

Timer On Network

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?