Unit 10: Topics 1-4

Unit 10: Topics 1-4

11th Grade

12 Qs

quiz-placeholder

Similar activities

Representing and Interpreting Functions

Representing and Interpreting Functions

9th Grade - University

14 Qs

Introduction to Functions

Introduction to Functions

9th Grade - University

10 Qs

Keystone Review Module 2

Keystone Review Module 2

9th - 12th Grade

12 Qs

Section 6 - 3: Graphing Square Root Functions

Section 6 - 3: Graphing Square Root Functions

10th - 11th Grade

10 Qs

Assessment #1 Review

Assessment #1 Review

11th Grade

15 Qs

Analyzing Graphs

Analyzing Graphs

9th - 12th Grade

11 Qs

Abeka Algebra

Abeka Algebra

9th Grade - University

10 Qs

Properties of Functions Quick Check (Algebra 1 TEKS)

Properties of Functions Quick Check (Algebra 1 TEKS)

9th - 12th Grade

10 Qs

Unit 10: Topics 1-4

Unit 10: Topics 1-4

Assessment

Quiz

Mathematics

11th Grade

Medium

CCSS
HSA.REI.A.2, HSF-BF.B.4A, 7.EE.B.4A

+1

Standards-aligned

Created by

AryannaSeptembe Avila

Used 3+ times

FREE Resource

12 questions

Show all answers

1.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

The time required to empty a tank varies inversely as the rate of pumping. If a pump can empty a tank in 30 minutes at the rate of 250 kl/min, how long will it take the pump to empty the same tank at the rate of 100 kl/min?

60 minutes

10 minutes

7,500 minutes

75 minutes

2.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

Those are both correct solutions

There is no solution

Tags

CCSS.HSA.REI.A.2

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

{3}

{-2}

{5, 7}

{-4, -1}

Tags

CCSS.HSA.REI.A.2

4.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

3

4

5

8

Tags

CCSS.HSA.REI.A.2

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The director of the Bigtown Aquarium would like to have a ratio of 3 catfish for every 7 rainbow trout. The aquarium currently has 4 catfish and 21 rainbow trout. Which equation could be used to determine x, the number of additional catfish that needs to be purchased in order to get the desired ratio?

Tags

CCSS.7.EE.B.4A

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The time required to do a job varies inversely as the number of people working. It takes 10 hours for 4 bricklayers to build a park wall. How long will it take 8 brick layers to complete the job?

5 hours

50 hours

40 hours

4 hours

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

7

-7

6

-6

Tags

CCSS.HSA.REI.A.2

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?