12.1 Program Development Life Cycle Cambridge iAS 9618

12.1 Program Development Life Cycle Cambridge iAS 9618

11th Grade

20 Qs

quiz-placeholder

Similar activities

AP Computer Principles Quiz

AP Computer Principles Quiz

11th Grade - University

23 Qs

Projetos RUP (Fases Elaboração e Construção)

Projetos RUP (Fases Elaboração e Construção)

1st - 12th Grade

18 Qs

System Development Life Cycle

System Development Life Cycle

11th - 12th Grade

21 Qs

NOCTI Computer Programming Review

NOCTI Computer Programming Review

9th - 12th Grade

15 Qs

J277 Test, trace and validate

J277 Test, trace and validate

9th - 11th Grade

21 Qs

Unit 1 - Computing Innovations and Collaboration Vocabulary

Unit 1 - Computing Innovations and Collaboration Vocabulary

11th Grade

19 Qs

Computer Programming Nocti

Computer Programming Nocti

9th - 12th Grade

15 Qs

ICT112 Lesson 2 Review

ICT112 Lesson 2 Review

11th Grade

15 Qs

12.1 Program Development Life Cycle Cambridge iAS 9618

12.1 Program Development Life Cycle Cambridge iAS 9618

Assessment

Quiz

Computers

11th Grade

Easy

Created by

Stephen Ling-Winston

Used 1+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary purpose of a development life cycle in programming?

To provide a structured approach to developing software.

To write the code of the program.

To reduce the size of the program.

To distribute the program to users.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is an example of a type of development life cycle?

Waterfall, Iterative, Rapid Application Development (RAD).

Random, Predictive, Structural.

Compilation, Debugging, Testing.

Design, Coding, Testing.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a characteristic of the Waterfall development life cycle?

It follows a linear, sequential approach where each stage is completed before moving to the next.

It allows for iterative improvements during the development process.

It is best suited for projects that require quick delivery of software.

It allows multiple stages to occur simultaneously.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a benefit of the Waterfall model?

It provides a clear structure and defined stages.

It is flexible and adaptable during development.

It minimizes documentation requirements.

It is ideal for projects with frequent changes.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a major drawback of the Waterfall model?

It is inflexible and difficult to adapt to changes once development has started.

It requires less documentation than other models.

It allows for early testing of software components.

It is suited for projects that have vague or unclear requirements.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does the Iterative development life cycle allow?

It allows development to be repeated in cycles, where each iteration improves upon the last.

It completes all stages in a strict order with no room for revision.

It requires only one round of testing before the software is finalized.

It focuses on gathering detailed user requirements from the beginning.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a benefit of using the Iterative model?

It allows for flexibility and adaptation to changes during development.

It does not require testing after the first iteration.

It speeds up the delivery of the software with minimal changes.

It eliminates the need for documentation.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?