software engineering quiz

software engineering quiz

KG - University

18 Qs

quiz-placeholder

Similar activities

Advanced Topics in Software Engineering (Part 1)

Advanced Topics in Software Engineering (Part 1)

University

13 Qs

Quiz on Software Engineering and Testing Models

Quiz on Software Engineering and Testing Models

University

14 Qs

2.1 software development models

2.1 software development models

10th Grade

21 Qs

Software Development Test

Software Development Test

10th - 12th Grade

20 Qs

Software Engineering

Software Engineering

University

15 Qs

SDLC - revision

SDLC - revision

University

22 Qs

AMADS

AMADS

12th Grade

20 Qs

System Analysis

System Analysis

1st - 5th Grade

19 Qs

software engineering quiz

software engineering quiz

Assessment

Quiz

Computers

KG - University

Hard

Created by

sandhya sangaraju

Used 39+ times

FREE Resource

18 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the first step in the software development lifecycle?

System Design

Coding

System Testing

Preliminary Investigation and Analysis

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the following is involved in the system planning and designing phase of the Software Development Life Cycle (SDLC)?

Sizing

Parallel run

Specification freeze

All of the above

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What does RAD stand for?

Rapid Application Document

Rapid Application Development

Relative Application Development

None of the above

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the following prototypes does not associated with Prototyping Model?

Domain Prototype

Vertical Prototype

Horizontal Prototype

Diagonal Prototype

5.

FILL IN THE BLANK QUESTION

1 min • 1 pt

The major drawback of RAD model is __________.

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the following does not relate to Evolutionary Process Model?

Incremental Model

Concurrent

Development Model

WINWIN Spiral Model

All of the above

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the major drawback of the Spiral Model?

Higher amount of risk analysis

Doesn't work well for smaller projects

Additional functionalities are added later on

Strong approval and documentation control

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?