1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
How many working days in advance must the RMP notify the administrative authority before inspection?
A. 1 day
B. 2 days
C. 3 days
D. 5 days
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When can a plumbing system be covered or used?
A. After completion of installation
B. After approval of the administrative authority
C. After the first water test
D. Anytime during construction
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What are the approved testing media for plumbing, drainage, and vent systems?
A. Water and oil
C. Water and air
D. Steam and air
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
During a water test, how high should the water head be maintained for 15 minutes?
A. 1 meter
B. 2 meters
C. 3 meters
D. 4 meters
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What air pressure should be applied for an air test?
A. 20.5 kPa
B. 34.5 kPa
C. 50.5 kPa
D. 100 kPa
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the equivalent measurement of 34.5 kPa in mercury head?
A. 100 mm
B. 200 mm
C. 254 mm
D. 300 mm
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the correct pressure requirement for testing hot and cold water supply pipes?
A. 100% of the working pressure
B. 125% of the working pressure
C. 150% of the working pressure
D. 200% of the working pressure
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?