IUCEE ConQuest: The Ultimate Technical Quiz Challenge

IUCEE ConQuest: The Ultimate Technical Quiz Challenge

University

10 Qs

quiz-placeholder

Similar activities

Quiz: Ancient Roads and Bridges

Quiz: Ancient Roads and Bridges

University

10 Qs

Quiz: High Voltage Measurement

Quiz: High Voltage Measurement

University

11 Qs

IUCEE ConQuest: The Ultimate Technical Quiz Challenge

IUCEE ConQuest: The Ultimate Technical Quiz Challenge

University

10 Qs

Case Study - Himalayan Mega Dam

Case Study - Himalayan Mega Dam

10th Grade - University

13 Qs

Process Development & Project Engineering

Process Development & Project Engineering

University

15 Qs

Topic 4 - Technology and Communication Development in Civil Eng

Topic 4 - Technology and Communication Development in Civil Eng

University

15 Qs

PAVEMENT DESIGN

PAVEMENT DESIGN

University

15 Qs

Building Quantities Documentation Quiz

Building Quantities Documentation Quiz

University

10 Qs

IUCEE ConQuest: The Ultimate Technical Quiz Challenge

IUCEE ConQuest: The Ultimate Technical Quiz Challenge

Assessment

Quiz

Engineering

University

Hard

Created by

NICMAR IUCEE

Used 1+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Which Indian Standard code governs the design process for lateral forces in buildings?

  1. IS 873-1987

  1. IS 875-1987

  1. IS 1893-2016

  1. IS 456-2000

2.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Phosphogypsum, a byproduct used in construction materials, originates from

  1. Thermal power plants

  1. Fertilizer plants

  1. Steel mills

  1. Aluminium smelters

3.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Silica fume contains approximately what percentage of silicon dioxide?

45%

75%

90%

80#

4.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Dragline excavation equipment operates primarily by

  1. Pushing materiaL

  1. Rotating cutting teeth

  1. Vibrating soil layers

  1. Dragging a bucket horizontally

5.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Digitalization in Construction:

Which technology is critical for

optimizing earthwork operations

through real-time compaction

monitoring?

Blockchain

BIM 4D sequencing

RFID Tag

LiDAR-equipped drones

6.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

The primary purpose of Al-driven

"digital twin" models in construction is to

  1. Simulate real-time structural

  1. Replace human site engineers

  1. Generate architectural renderings

  1. Automate payroll systems

7.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Which factor does NOT influence

excavation equipment selection?

Soil abrasiveness index

Cost/benefit ratio

Brand popularity

Required production rate

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?