Nec practice review 5 questions #5

Authored by andrew h

Construction

Professional Development

Nec practice review 5 questions #5
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

5 questions

Show all answers

1.

FILL IN THE BLANKS QUESTION

5 mins • 1 pt

Each outlet installed for the purpose of charging electric vehicles shall be supplied by an individual (a)   circuit that shall have no other outlets

2.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

Where overcurrent protective devices that have been previously used are installed in a temporary installation, the phrase "evidence of impending failure" means that there is evidence such as _____.

arcing

loose or bound equipment parts

visible damage or deterioration

any of these

3.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

For temporary installations, cable assemblies, flexible cords, and flexible cables shall be supported by ____ or similar fittings so as not to damage the wiring.

staples

cable ties

straps

any of these

4.

FILL IN THE BLANKS QUESTION

5 mins • 1 pt

Wiring methods in a (a)   environment in areas covered by Article 680, shall be listed and identified for use in such areas.

5.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

Temporary electrical power and lighting installations shall be permitted for a period not to exceed 90 days for _____ decorative lighting and similar purposes.

Christmas

New Year's

July 4th

Holiday

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Microsoft

Continue with Microsoft

or continue with

Facebook

Facebook

Apple

Apple

Others

Others

Already have an account?