Nec practice review 5 questions #5

Nec practice review 5 questions #5

Professional Development

5 Qs

quiz-placeholder

Similar activities

Line check (Punch list)

Line check (Punch list)

Professional Development

10 Qs

Nec practice #6 8 questions

Nec practice #6 8 questions

Professional Development

8 Qs

Nec practice review 5 questions #5

Nec practice review 5 questions #5

Assessment

Quiz

Construction

Professional Development

Hard

Created by

andrew h

FREE Resource

5 questions

Show all answers

1.

FILL IN THE BLANK QUESTION

5 mins • 1 pt

Each outlet installed for the purpose of charging electric vehicles shall be supplied by an individual _____ circuit that shall have no other outlets

2.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

Where overcurrent protective devices that have been previously used are installed in a temporary installation, the phrase "evidence of impending failure" means that there is evidence such as _____.

arcing

loose or bound equipment parts

visible damage or deterioration

any of these

3.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

For temporary installations, cable assemblies, flexible cords, and flexible cables shall be supported by ____ or similar fittings so as not to damage the wiring.

staples

cable ties

straps

any of these

4.

FILL IN THE BLANK QUESTION

5 mins • 1 pt

Wiring methods in a _____ environment in areas covered by Article 680, shall be listed and identified for use in such areas.

5.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

Temporary electrical power and lighting installations shall be permitted for a period not to exceed 90 days for _____ decorative lighting and similar purposes.

Christmas

New Year's

July 4th

Holiday