The Goal – End of Book Quiz

The Goal – End of Book Quiz

9th - 12th Grade

10 Qs

quiz-placeholder

Similar activities

Electrical Technology NCCER Module 12 Review

Electrical Technology NCCER Module 12 Review

9th - 12th Grade

10 Qs

Production Technology Quiz

Production Technology Quiz

9th Grade

12 Qs

SMAW Equipment and Supplies

SMAW Equipment and Supplies

10th Grade - University

15 Qs

L1 Setting out buildings

L1 Setting out buildings

11th Grade

14 Qs

Shop Safety: Hand Tools

Shop Safety: Hand Tools

9th Grade

15 Qs

PPT 11 - Decommission systems and components

PPT 11 - Decommission systems and components

12th Grade

11 Qs

Core Module 103- Introduction to Hand Tools

Core Module 103- Introduction to Hand Tools

10th Grade

15 Qs

L2 Cavity wall - Cold bridging, cavity trays, lintels

L2 Cavity wall - Cold bridging, cavity trays, lintels

12th Grade

13 Qs

The Goal – End of Book Quiz

The Goal – End of Book Quiz

Assessment

Quiz

Construction

9th - 12th Grade

Practice Problem

Easy

Created by

Patrick Jenkins

Used 3+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in the Theory of Constraints?

Subordinate everything else to the constraint

Elevate the system's bottlenecks

Identify the system’s constraint

Exploit the constraint

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Throughput is best defined as:

The money spent on raw materials

The rate at which the system generates money through sales

The number of parts a machine can produce

The amount of time something spends in the system

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is considered *Inventory* in TOC terms?

Electricity used by machines

Wages paid to workers

Raw materials and work-in-progress

Customer orders waiting to be shipped

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If a process is already optimized and a new constraint appears, what should happen first?

Ignore the new constraint

Increase inventory at the constraint

Return to Step 1 of the 5 Focusing Steps

Hire more workers

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is an *Operational Expense*?

Unused materials in storage

Machine downtime

Employee wages and electricity

Revenue from sales

6.

REORDER QUESTION

1 min • 1 pt

The five focusing steps of TOC are:

Subordinate everything else to the constraint (adjust other steps so they don’t outpace the bottleneck)

Exploit the constraint (use it as effectively as possible)

Identify the constraint (find what is slowing down the system)

Elevate the constraint (make a bigger change if needed to fix it)

Repeat the process again (because the constraint may have moved)

7.

OPEN ENDED QUESTION

3 mins • 1 pt

In *The Goal*, what did Jonah describe as the “goal” of any business or production system?

Evaluate responses using AI:

OFF

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?