Practice and Theory 8

Practice and Theory 8

University

70 Qs

quiz-placeholder

Similar activities

UNIX Operating System Quiz

UNIX Operating System Quiz

University

74 Qs

Digital electronics

Digital electronics

University

68 Qs

Audio Engineering Quiz

Audio Engineering Quiz

University

66 Qs

HIGHWAY AND RAILROAD ENGR.

HIGHWAY AND RAILROAD ENGR.

University

70 Qs

Structural Mechanics

Structural Mechanics

University

65 Qs

Python Programming Test

Python Programming Test

University

75 Qs

Marine Automation Midterm Exam

Marine Automation Midterm Exam

University

70 Qs

Practice and Theory 6

Practice and Theory 6

University

73 Qs

Practice and Theory 8

Practice and Theory 8

Assessment

Quiz

Engineering

University

Hard

Created by

Sangguniang Libueg

FREE Resource

70 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

  1. Shall be fixed in a position on the surface of the earth by monuments of permanent nature.

Project Survey 

Control Survey

Project Control Survey

Geodetic Survey

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

 What is the baseline length for the Primary Geodetic Network in Second Order?  

50 kilometers

25 kilometers 

5 kilometers

Each barangay shall have at least a pair of Control Points not more than 2 kilometers apart

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the baseline length for the Primary Geodetic Network in First Order?

50 kilometers

25 kilometers

5 kilometers

2 kilometers

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the baseline length for the Secondary Geodetic Network in 3rd Order?

50 kilometers

25 kilometers

5 kilometers

2 kilometers

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the baseline length for the Secondary Geodetic Network in 3rd Order?

50 kilometers

50 kilometers

5 kilometers

Each barangay shall have at least a pair of Control Points not more than 2 kilometers apart

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In section 11 how many GNSS receivers are sufficient for all purposes?

At least 3 receivers

More than 3 receivers

At least 2 receivers

More than 2 receivers

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Survey Order as defined in Section 15 of DAO No. 2007-29 shall be issued

NAMRIA Administrator

DENR Secretary

Regional Executive Director

Regional Technical Director

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?