Reactive vs Planned Maintenance Quiz

Reactive vs Planned Maintenance Quiz

Vocational training

6 Qs

quiz-placeholder

Similar activities

Predictive Maintenance Quiz

Predictive Maintenance Quiz

University

10 Qs

Preventive Maintenance Quiz

Preventive Maintenance Quiz

KG - University

10 Qs

PAT ITL

PAT ITL

11th Grade

10 Qs

HSE Quiz - 2

HSE Quiz - 2

Professional Development

10 Qs

Recap of Sessions 14 & 15

Recap of Sessions 14 & 15

11th Grade - University

10 Qs

Maintenance Quiz

Maintenance Quiz

KG - University

6 Qs

PS: 08/23/24: Engineering Job Functions

PS: 08/23/24: Engineering Job Functions

11th Grade

11 Qs

Troubleshooting Industrial Motors Quiz

Troubleshooting Industrial Motors Quiz

12th Grade

8 Qs

Reactive vs Planned Maintenance Quiz

Reactive vs Planned Maintenance Quiz

Assessment

Quiz

Engineering

Vocational training

Easy

Created by

Oliver Fsadni

Used 2+ times

FREE Resource

6 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following best describes reactive maintenance?

Performing maintenance at regular intervals to prevent failure

Replacing equipment before it breaks down

Repairing equipment only after it has failed

Inspecting equipment to detect early signs of wear

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main goal of planned preventive maintenance?

To increase the need for emergency repairs

To prevent failures through scheduled maintenance activities

To reduce maintenance costs by delaying repairs

To use equipment until it breaks down

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which type of maintenance is more likely to cause unplanned downtime?

Reactive Maintenance

Planned Preventive Maintenance

Both are equally likely

Neither type of maintenance causes downtime

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a disadvantage of reactive maintenance?

Higher upfront labor planning

Reduced spare parts inventory costs

Increased risk of unexpected breakdowns and safety hazards

Risk of frequent scheduled shutdowns

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following tasks is an example of planned preventive maintenance?

Waiting for a pump to leak before replacing it

Replacing air filters every 3,000 hours

Fixing a conveyor belt after it snaps

Ignoring vibration in a motor until it stops working

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following statements is true?

Reactive maintenance is more cost-effective in the long term for critical assets

Reactive maintenance requires detailed scheduling and documentation

Planned preventive maintenance helps extend equipment lifespan

Planned preventive maintenance increases the likelihood of emergency repairs