The Construction Industry Questions

The Construction Industry Questions

Professional Development

32 Qs

quiz-placeholder

Similar activities

Security + (SY0-501) Domain 5

Security + (SY0-501) Domain 5

Professional Development

30 Qs

Shoulder Girdle

Shoulder Girdle

Professional Development

32 Qs

ISO Quiz Session 2 - Controlling (Sustainable Operation Pillar)

ISO Quiz Session 2 - Controlling (Sustainable Operation Pillar)

Professional Development

31 Qs

203 Electrical Installations Technology

203 Electrical Installations Technology

11th Grade - Professional Development

30 Qs

Level 2 - 8202 Ring and Radial circuits Quiz

Level 2 - 8202 Ring and Radial circuits Quiz

Professional Development

27 Qs

Monday Quiz (Mar. 07)

Monday Quiz (Mar. 07)

Professional Development

30 Qs

Google Certification Level 1

Google Certification Level 1

Professional Development

29 Qs

PBU - Broker Sales - Test - Jan'23

PBU - Broker Sales - Test - Jan'23

Professional Development

27 Qs

The Construction Industry Questions

The Construction Industry Questions

Assessment

Quiz

Other

Professional Development

Medium

Created by

Jack Caro

Used 2+ times

FREE Resource

32 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Energy efficiency in construction relates to methods and materials which...

Limit energy use

Effect heat loss

Produce energy

Control heat gain

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Designated skips and containers are mainly used to...

Increase recycling of waste

Reduce land fill

To avoid financial penalty

To resell waste for profit

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What does ‘just in time’ mean, with respect to construction.

Completing the project at the last possible hour

Materials are ordered and delivered just at the point they are required

Paying employee wages on the last day of the project

Using cement before it hardens

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The environmental benefit of the use of off-site construction is that it...

Is only suitable for social housing

Reduces the amount of waste material

Increases site deliveries

Increases build times

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the following statements describes a risk assessment?

A feasibility study into the likely harm caused to an operative where standards are not upheld

A report to the highway’s agency detailing project dangers

A statement of where the project is likely to be unsuccessful against specified deadlines

An assessment of safety dangers related to the task being carried out

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

When preparing complex construction components, which of the following are appropriate sources of information?

Delivery ledger and tool box talk sign-off sheets

Method statements and specification

Hand tool inspection sheets and fire risk assessment

Time sheets and induction log

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What information is shown in drawings and specifications?

When site opening hours are

Site layout and fire assembly points are

Where the nearest hospital is

What materials go in which floor area, floor area sizes

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?