Drainage power point 2 2025

Drainage power point 2 2025

Vocational training

29 Qs

quiz-placeholder

Similar activities

PPT 9 - Install and test systems and components

PPT 9 - Install and test systems and components

12th Grade

28 Qs

Rainwater 1

Rainwater 1

KG - University

30 Qs

Plumbing Processes PPT 2 - Power Tools

Plumbing Processes PPT 2 - Power Tools

12th Grade - University

25 Qs

PPT 8 - Soil Stacks

PPT 8 - Soil Stacks

12th Grade - University

26 Qs

PPT 8,9,10 DRAINAGE QUIZ

PPT 8,9,10 DRAINAGE QUIZ

12th Grade - University

32 Qs

Drainage power point 5 2025

Drainage power point 5 2025

KG - University

24 Qs

Understand the requirements of drainage systems

Understand the requirements of drainage systems

12th Grade

31 Qs

Hot Water - PPT 3 - Pipework and Circulation

Hot Water - PPT 3 - Pipework and Circulation

12th Grade

32 Qs

Drainage power point 2 2025

Drainage power point 2 2025

Assessment

Quiz

Construction

Vocational training

Medium

Created by

Gary Jones

Used 4+ times

FREE Resource

29 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In a secondary ventilated stack system, the main stack has a secondary vent, which is connected from just above the ________ going up to the dry section of the stack.

long radius bend

trap

floor

roof

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Look at the diagram of the Secondary ventilated stack system. What is the name of the vertical pipe that provides additional ventilation to the system?

Secondary ventilating stack

Soil pipe

Waste pipe

Main drain

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Look at the diagram of the Ventilated branch system. What is the name of the vertical pipe labeled as the main air passage for ventilation?

Main ventilating stack

Soil pipe

Waste pipe

Branch vent

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

In the diagram of the Ventilated branch system, which part is labeled as the horizontal pipe that carries waste water to the main discharge stack?

Branch discharge pipe

Vent pipe

Main discharge stack

Soil pipe

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the minimum size of the branch ventilating pipe for a single appliance in a ventilated branch system?

20mm

25mm

32mm

40mm

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The size of the branch ventilating pipe for multiple appliances in a ventilated branch system is _______.

32mm

25mm

40mm

50mm

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

According to the 'Ventilated branch system', where must any branch ventilating pipe be connected?

To the discharge stack below the spillover level of the appliance

To the discharge stack above the spillover level of the appliance

Directly to the appliance

To the main water supply

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?