1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What does IBS stand for?
Integrated Building System
Industrialised Building System
Innovative Building System
Intelligent Building System
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is a requirement for government projects exceeding RM10M?
Achieve 80 IBS Score
Achieve 60 IBS Score
Achieve 70 IBS Score
Achieve 50 IBS Score
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the primary focus of the IBS construction method?
Minimizing costs
Maximizing construction time
Producing components in controlled situations
Using more on-site workers
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
According to SMM2 rules, what should be included in the description of precast units?
The location of the factory
Only the size of the units
Mix or strength requirements of the concrete
The color of the units
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the clause number for 'Coping, kerbs, lintel, etc.'?
F.17
F.20
F.19
F.18
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What must be stated when enumerating copings, kerbs, and similar units?
Only the total length
The size and catalogue reference number
The color and texture
The location of installation
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is required for the design of precast units that need temporary support?
No specific requirements
Only the size of the supports
Details of the requirements must be given
The color of the supports
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?