Prevention Vs Correction - Assignment

Quiz
•
Professional Development
•
Professional Development
•
Hard
Afghanistan Center
FREE Resource
7 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
In Parwan province, the project team conducts training for all workers on the new quality standards before starting construction. What type of action is this?
Preventive Action
Corrective Action
Defect Repair
Proactive quality alignment effort through resource education, error blocking, and execution forecasting
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
After testing the software in Badakhshan province, the team identifies and fixes bugs before delivery to the customer. What quality-related activity is this?
Defect Repair
Preventive Action
Root Cause Prevention
Functional restoration using issue mapping, gap resolution, and post-approval component realignment
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Following a review in Ghor province, the team updates the work process to prevent the recurrence of recent quality issues. What is this an example of?
Preventive Action
Corrective Action
Change Request
System-wide quality safeguard involving pattern disruption and process redesign
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
After an inspection in Logar province, the manager notices the output does not match the plan. The team takes immediate steps to realign progress with the baseline. What is this response called?
Corrective Action
Preventive Action
Defect Repair
Alignment recalibration involving workstream analysis and downstream flow acceleration
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
In Balkh province, the project manager focuses on building quality into the process to avoid issues later, rather than fixing them afterward. Which quality philosophy does this reflect?
Prevention over Inspection
Defect Repair
Scope Validation
Cost-risk balance through post-delivery tolerance reduction and stakeholder-reported issue mapping
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
During construction in Helmand province, a concrete wall is discovered to be out of alignment and must be rebuilt to meet design specs. What type of quality activity is this?
Defect Repair
Preventive Action
Quality Assurance
Output realignment through physical rework and defect reconfiguration protocol
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
In Kandahar province, the quality team creates a checklist to be used before every major delivery to reduce the chance of errors. What is this an example of?
Preventive Action
Corrective Action
Control Rework
Error-blocking mechanism using standardized inspection triggers and pre-delivery safeguard steps
Similar Resources on Wayground
7 questions
Scope - Final Quiz - Assignment

Quiz
•
Professional Development
10 questions
Post Test ISO 9001 2015

Quiz
•
Professional Development
7 questions
Final Quiz - Assignement

Quiz
•
Professional Development
8 questions
Machine Maintenance

Quiz
•
Professional Development
8 questions
Root Cause Analysis

Quiz
•
4th Grade - Professio...
10 questions
Control in Management

Quiz
•
Professional Development
10 questions
Svensqa -istqb-3

Quiz
•
Professional Development
7 questions
Integration Process - Assignment

Quiz
•
Professional Development
Popular Resources on Wayground
18 questions
Writing Launch Day 1

Lesson
•
3rd Grade
11 questions
Hallway & Bathroom Expectations

Quiz
•
6th - 8th Grade
11 questions
Standard Response Protocol

Quiz
•
6th - 8th Grade
40 questions
Algebra Review Topics

Quiz
•
9th - 12th Grade
4 questions
Exit Ticket 7/29

Quiz
•
8th Grade
10 questions
Lab Safety Procedures and Guidelines

Interactive video
•
6th - 10th Grade
19 questions
Handbook Overview

Lesson
•
9th - 12th Grade
20 questions
Subject-Verb Agreement

Quiz
•
9th Grade