Final Quiz - Assignement

Final Quiz - Assignement

Professional Development

7 Qs

quiz-placeholder

Similar activities

PMP PROJECT QUALITY MANAGEMENT

PMP PROJECT QUALITY MANAGEMENT

Professional Development

10 Qs

10 soal campuran (June)

10 soal campuran (June)

Professional Development

10 Qs

Leadership Styles - Assignment

Leadership Styles - Assignment

Professional Development

10 Qs

Svensqa -istqb-3

Svensqa -istqb-3

Professional Development

10 Qs

Project Management - Pertamina

Project Management - Pertamina

Professional Development

10 Qs

Integration Process - Assignment

Integration Process - Assignment

Professional Development

7 Qs

Scope - Final Quiz - Assignment

Scope - Final Quiz - Assignment

Professional Development

7 Qs

Quiz Lesson 6 - Topic A (Project/Phase Closure)

Quiz Lesson 6 - Topic A (Project/Phase Closure)

Professional Development

8 Qs

Final Quiz - Assignement

Final Quiz - Assignement

Assessment

Quiz

Professional Development

Professional Development

Hard

Created by

Afghanistan Center

FREE Resource

7 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In Ghazni province, a project team holds a process improvement session before execution begins to avoid past quality failures. What type of action is this?

Preventive Action

Corrective Action

Defect Repair

Quality reinforcement through retrospective tracking and downstream error resilience

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In Uruzgan province, the team uses basic but durable materials for furniture. They lack luxury appearance but meet strength and safety standards. How should this be classified?

Low-grade, high-quality

High-grade, low-quality

Low-quality, low-grade

Product configuration gap involving deliverable simplification and outcome degradation

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In Balkh province, the project team conducts internal audits during the execution phase to confirm that project processes are being followed correctly. Which quality activity is being performed?

Quality Assurance

Quality Control

Defect Repair

Compliance monitoring through output inspection and post-delivery error classification

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In Herat province, the PM includes inspection, rework, and warranty support costs in the project budget. What are these costs collectively known as?

Cost of Quality (CoQ)

Control Costs

Resource Reserves

Total lifecycle expenditure aligned with stakeholder validation, reprocessing, and external failure risk

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In Khost province, the team notices that a recently completed wall does not meet design specs. They decide to rebuild it. What action is being taken?

Defect Repair

Corrective Action

Preventive Action

Quality remediation using output correction, rework authorization, and deviation normalization

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In India, a team is investigating recurring defects in a product and draws a diagram to identify root causes like machine, method, and manpower. Which quality tool are they using?

Cause-and-Effect Diagram

Control Chart

Scatter Diagram

Root cause logic board integrating metric thresholds, operator judgment, and predictive forecasting

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In Panjshir province, the project team decides to spend more time early in the process ensuring requirements are well-understood and verified with stakeholders. Which quality principle does this best reflect?

Quality is planned in, not inspected in

Inspection is more important than prevention

Deliverables should prioritize speed over clarity

Quality integration strategy driven by milestone review cycles and audit-preferred compliance standards