1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The measuring unit for site clearance

each
hectare

Answer explanation

Measured in square meters as per site clearance measurement .

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the labour required for 100 m² site clearance?

0.5 men
1 man
2 men
1.5 men

Answer explanation

Labour input: 0.5 men per 100 m² as specified in site clearance table.

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Felling trees is measured in:

Each
cm

Answer explanation

Felling measured as units per tree, so 'Each' is appropriate.

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Girth of a tree is taken at a height of:

1 m
0.5 m
1.5 m
2 m

Answer explanation

Girth is recorded at a height of 1 m from the base as per tree felling notes.

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Payment for earthwork excavation is made per:

1 m³
10 m³
100 m³

Answer explanation

Payment based on volumetric excavation units; 10 m³ per schedule.

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Initial lead for excavation is:

50 m
30 m
100 m
60 m

Answer explanation

Horizontal distance from excavation to deposition site = 50 m (initial lead).

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Initial lift for excavation is:

1.5 m
2.0 m
1.0 m
0.5 m

Answer explanation

Vertical distance taken for single lift = 1.5 m (initial lift).

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?