1.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
The measuring unit for site clearance
Answer explanation
Measured in square meters as per site clearance measurement .
2.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
What is the labour required for 100 m² site clearance?
Answer explanation
Labour input: 0.5 men per 100 m² as specified in site clearance table.
3.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Felling trees is measured in:
Answer explanation
Felling measured as units per tree, so 'Each' is appropriate.
4.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Girth of a tree is taken at a height of:
Answer explanation
Girth is recorded at a height of 1 m from the base as per tree felling notes.
5.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Payment for earthwork excavation is made per:
Answer explanation
Payment based on volumetric excavation units; 10 m³ per schedule.
6.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Initial lead for excavation is:
Answer explanation
Horizontal distance from excavation to deposition site = 50 m (initial lead).
7.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Initial lift for excavation is:
Answer explanation
Vertical distance taken for single lift = 1.5 m (initial lift).
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?