SOP Training

SOP Training

Professional Development

29 Qs

quiz-placeholder

Similar activities

Zain Ul Abiddin

Zain Ul Abiddin

Professional Development

24 Qs

ICH Review

ICH Review

Professional Development

27 Qs

BigRentz Aptitude Test

BigRentz Aptitude Test

Professional Development

25 Qs

Construction Kalimantan

Construction Kalimantan

Professional Development

25 Qs

INDIHOME 3P JULI 2018

INDIHOME 3P JULI 2018

University - Professional Development

30 Qs

Perfils mobils linux

Perfils mobils linux

Professional Development

24 Qs

All things navigation

All things navigation

8th Grade - Professional Development

28 Qs

Training Expectations Quiz

Training Expectations Quiz

Professional Development

26 Qs

SOP Training

SOP Training

Assessment

Quiz

Professional Development

Professional Development

Medium

Created by

Muhammad Atif Islam

Used 3+ times

FREE Resource

29 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of the 11kV Operations Logging Procedure?

To manage load shedding operations

To log details of 11kV outgoing feeders in case of tripping and switching operations

To maintain grid cleanliness

To oversee visitor procedures

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be logged in the 11kV Operation Book in case of feeder tripping?

Date of tripping

Name of Feeder

Trip Time

All of the above

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

For which condition of 11 KV switching on operation, GSO Control engineer name will be logged in the grid log book?

Main cable fault

Over current and earth instantaneous trip

Both A & B

None of the above

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done if UFR & UV operate?

Log only the timing of the tripping of feeders

Log details of all tripped feeders in the logbook at the grid station

Log details of incoming of PTR

None of the above

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be logged in the 11kV Operation Book in case of switching off operations?

Date of OFF-TFS, OFF-DB

Name of Feeder

Operation Time

All of the above

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done in case of any main cable fault?

Energize after clearance from GSO Control

Energize after clearance from OCR Engineer on IP/ Wireless

Energize after clearance from NC

Clearance shall be recorded in the log book before energization

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be logged in the column of Switching ON Operations?

Date of energization

Clearance Time

Switch ON time

All of the above

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?