2nd year supervision level

2nd year supervision level

Vocational training

20 Qs

quiz-placeholder

Similar activities

303 Scientific Principles Quiz

303 Scientific Principles Quiz

2nd Grade - University

20 Qs

Hot Water Systems RECAP

Hot Water Systems RECAP

12th Grade - University

15 Qs

Overseeing Electrical work Sample questions

Overseeing Electrical work Sample questions

KG - University

16 Qs

Health and Safety revision

Health and Safety revision

KG

19 Qs

Conductors and Cables (Electrical L1) Quiz

Conductors and Cables (Electrical L1) Quiz

12th Grade

15 Qs

QCM – Niveau CAP (Second œuvre)

QCM – Niveau CAP (Second œuvre)

KG - University

20 Qs

Copper pipework CP-1

Copper pipework CP-1

KG - University

20 Qs

Bpec Plastic pipework

Bpec Plastic pipework

KG - University

19 Qs

2nd year supervision level

2nd year supervision level

Assessment

Quiz

Construction

Vocational training

Practice Problem

Hard

Created by

Corey Latta

Used 3+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

New electrical installation work: including wiring of main and sub-main circuits and final sub-circuits, earthed cable tray installation, conduit installation, underground and overhead wiring installation - maximum cable size of 35mm2

Direct

General

Broad

Not permitted

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Maintenance, alterations and additions to existing electrical installations including sub-mains and main installation - maximum cable size of 35mm2

Direct

General

Broad

Not permitted

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Installation of main, sub-main and final subcircuit cables of 35mm2 and greater

Direct

General

Broad

Not permitted

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Tag and lockout procedure on de-energised installations

Direct

General

Broad

Not permitted

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Distribution and main switchboard installation with maximum switchboard capacity of 200 amps

Direct

General

Broad

Not permitted

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Distribution and main switchboard installation with maximum switchboard capacity above 200 amps

Direct

General

Broad

Not permitted

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Testing (not connected to electricity supply or isolated and proven de-energised by supervising electrician)

Direct

General

Broad

Not permitted

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?