2nd year supervision level

2nd year supervision level

Vocational training

20 Qs

quiz-placeholder

Similar activities

Y2 Science: Solenoids relays and contactors

Y2 Science: Solenoids relays and contactors

KG - University

16 Qs

Conductors and Cables (Electrical L1) Quiz

Conductors and Cables (Electrical L1) Quiz

12th Grade

15 Qs

Understanding Electrical Installations Quiz

Understanding Electrical Installations Quiz

KG - University

20 Qs

Copper pipework CP-1

Copper pipework CP-1

KG - University

20 Qs

Unit 122/124 Scratch/Floating Coats

Unit 122/124 Scratch/Floating Coats

12th Grade

20 Qs

PPT 7 - Prepare for the installation of systems and components

PPT 7 - Prepare for the installation of systems and components

12th Grade

21 Qs

303 Scientific Principles Quiz

303 Scientific Principles Quiz

2nd Grade - University

20 Qs

Overseeing Electrical work Sample questions

Overseeing Electrical work Sample questions

KG - University

16 Qs

2nd year supervision level

2nd year supervision level

Assessment

Quiz

Construction

Vocational training

Hard

Created by

Corey Latta

Used 3+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

New electrical installation work: including wiring of main and sub-main circuits and final sub-circuits, earthed cable tray installation, conduit installation, underground and overhead wiring installation - maximum cable size of 35mm2

Direct

General

Broad

Not permitted

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Maintenance, alterations and additions to existing electrical installations including sub-mains and main installation - maximum cable size of 35mm2

Direct

General

Broad

Not permitted

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Installation of main, sub-main and final subcircuit cables of 35mm2 and greater

Direct

General

Broad

Not permitted

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Tag and lockout procedure on de-energised installations

Direct

General

Broad

Not permitted

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Distribution and main switchboard installation with maximum switchboard capacity of 200 amps

Direct

General

Broad

Not permitted

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Distribution and main switchboard installation with maximum switchboard capacity above 200 amps

Direct

General

Broad

Not permitted

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Testing (not connected to electricity supply or isolated and proven de-energised by supervising electrician)

Direct

General

Broad

Not permitted

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?