Part 3.3

Part 3.3

Professional Development

15 Qs

quiz-placeholder

Similar activities

E-Commerce

E-Commerce

University - Professional Development

16 Qs

Java Fundamentals

Java Fundamentals

Professional Development

20 Qs

USE OF ICT IN THE LEARNING PROCESS

USE OF ICT IN THE LEARNING PROCESS

Professional Development

10 Qs

Mobile Technology

Mobile Technology

Professional Development

10 Qs

python quiz

python quiz

6th Grade - Professional Development

10 Qs

SC-900_Módulo 4

SC-900_Módulo 4

Professional Development

19 Qs

pemahaman tentang quizizz

pemahaman tentang quizizz

Professional Development

10 Qs

Scratch

Scratch

KG - Professional Development

10 Qs

Part 3.3

Part 3.3

Assessment

Quiz

Computers

Professional Development

Hard

Created by

Kirk Marshall

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Given a scenario where a company wants to minimize downtime after a disaster, which DR metric should they focus on to determine the maximum tolerable period in which data might be lost?

Recovery Time Objective (RTO)

Recovery Point Objective (RPO)

Mean Time Between Failures (MTBF)

Service Level Agreement (SLA)

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A business is considering three types of DR sites: cold, warm, and hot. If they need the fastest recovery time but are willing to pay higher costs, which type of DR site should they choose?

Cold site

Warm site

Hot site

Mobile site

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

You are tasked with improving the availability of a critical application. Which high-availability approach would best ensure continuous service if a single server fails?

Single server deployment

Active-passive clustering

Manual failover

Tape backup

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A company wants to test its disaster recovery plan without disrupting normal operations. Which method should they use?

Full interruption test

Tabletop exercise

Unannounced drill

Data center shutdown

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If a business sets an RTO of 4 hours for a critical system, what does this mean in practice?

The system must be backed up every 4 hours

The system must be restored within 4 hours after a disaster

The system can lose up to 4 hours of data

The system must be tested every 4 hours

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following best describes the main difference between a warm site and a cold site in disaster recovery?

Warm sites have no equipment, while cold sites have partial equipment

Warm sites have up-to-date data and running systems, while cold sites do not

Warm sites have some equipment and partial data, while cold sites have only basic infrastructure

Warm sites are more expensive than hot sites

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A company is considering implementing load balancing as part of its high-availability strategy. What is the primary benefit of this approach?

Reduces the need for backups

Distributes traffic to prevent overload on a single server

Eliminates the need for disaster recovery planning

Increases the cost of operations

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?