lole

lole

12th Grade

52 Qs

quiz-placeholder

Similar activities

THC 6 - PD&AE Final Examination

THC 6 - PD&AE Final Examination

University

50 Qs

INTERNAL DAN EKSTERNAL MEMORY

INTERNAL DAN EKSTERNAL MEMORY

University - Professional Development

51 Qs

BCA SIK SSRP

BCA SIK SSRP

12th Grade

50 Qs

Chapter 8: Patient Reception

Chapter 8: Patient Reception

University

51 Qs

RICA Domain 1

RICA Domain 1

University

50 Qs

INDIAN ECONOMY ON THE EVE OF INDEPENDENCE

INDIAN ECONOMY ON THE EVE OF INDEPENDENCE

12th Grade

49 Qs

CHƯƠNG 4: TRUYỀN THÔNG ĐẠI CHÚNG

CHƯƠNG 4: TRUYỀN THÔNG ĐẠI CHÚNG

University

55 Qs

REPASO FINAL HISTORIA Y DPCC

REPASO FINAL HISTORIA Y DPCC

University

52 Qs

lole

lole

Assessment

Quiz

Professional Development

12th Grade

Practice Problem

Easy

CCSS
7.NS.A.1C, 7.RP.A.3, 4.MD.C.5B

+2

Standards-aligned

Created by

Eduardo Bernal

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

52 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What does a solenoid valve do?

A. Opens and closes switches

B. Serves as an actuator to open and close pneumatic and hydraulic valves

C. Transforms volts to millivolts

D. Actuates to open and close terminal blocks

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the psi reading on MOST gauge pressure indicators that are at atmospheric pressure?

100

10

0

Below zero

Tags

CCSS.7.RP.A.3

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Proportional control is also known as

Derivative control

Reset control

Gain control

On - off control

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The document that’s required to loop check & commission are

P & ID , loop diagrams , and instrument specification sheets

P & ID and electrical drawings

Electrical drawings and typical installations detail sheets

Logic diagrams , loop sheets , and instrument operation manuals

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

In an Instrument loop, where would wet instrument air show up first?

In the air piping

At the dryer

In the filter regulator

At the valve positioner

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

A list of materials are found in:

General arrangement drawings

Instrument detail drawings

Piping orthographics

P & ID

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Signal cable shields should be connected to ground at:

Each accessible point in the signal path

Each end of the signal path

Each junction point in the signal path

1 point in the signal path

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?

Discover more resources for Professional Development