lole

lole

12th Grade

52 Qs

quiz-placeholder

Similar activities

Quiz FEE

Quiz FEE

9th Grade - University

50 Qs

Unit 12 BSE for Construction

Unit 12 BSE for Construction

12th Grade

47 Qs

Special Test

Special Test

University

52 Qs

PM D155-6R

PM D155-6R

10th Grade - Professional Development

50 Qs

Brake System (Wheel)

Brake System (Wheel)

1st - 12th Grade

50 Qs

Torqflow Transmisi

Torqflow Transmisi

1st - 12th Grade

55 Qs

L3 Mixed

L3 Mixed

University

50 Qs

Pemeliharaan Mesin Sepeda Motor XI

Pemeliharaan Mesin Sepeda Motor XI

11th - 12th Grade

50 Qs

lole

lole

Assessment

Quiz

Professional Development

12th Grade

Easy

Created by

Eduardo Bernal

Used 1+ times

FREE Resource

52 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What does a solenoid valve do?

A. Opens and closes switches

B. Serves as an actuator to open and close pneumatic and hydraulic valves

C. Transforms volts to millivolts

D. Actuates to open and close terminal blocks

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the psi reading on MOST gauge pressure indicators that are at atmospheric pressure?

100

10

0

Below zero

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Proportional control is also known as

Derivative control

Reset control

Gain control

On - off control

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The document that’s required to loop check & commission are

P & ID , loop diagrams , and instrument specification sheets

P & ID and electrical drawings

Electrical drawings and typical installations detail sheets

Logic diagrams , loop sheets , and instrument operation manuals

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

In an Instrument loop, where would wet instrument air show up first?

In the air piping

At the dryer

In the filter regulator

At the valve positioner

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

A list of materials are found in:

General arrangement drawings

Instrument detail drawings

Piping orthographics

P & ID

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Signal cable shields should be connected to ground at:

Each accessible point in the signal path

Each end of the signal path

Each junction point in the signal path

1 point in the signal path

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?