lole

lole

12th Grade

52 Qs

quiz-placeholder

Similar activities

REDES1

REDES1

University - Professional Development

50 Qs

TIU 5a

TIU 5a

5th Grade - University

47 Qs

National VPC Cadet Quiz - Gwent Police

National VPC Cadet Quiz - Gwent Police

8th Grade - University

48 Qs

NFHS Football Signals

NFHS Football Signals

9th - 12th Grade

47 Qs

UAS KONSEP DASAR KEPERAWATAN

UAS KONSEP DASAR KEPERAWATAN

University

50 Qs

Termos em Logística

Termos em Logística

University

50 Qs

Auto Technology Suspension ASE

Auto Technology Suspension ASE

11th - 12th Grade

52 Qs

ôn tập

ôn tập

1st Grade - University

49 Qs

lole

lole

Assessment

Quiz

Professional Development

12th Grade

Easy

CCSS
7.NS.A.1C, 7.RP.A.3, 4.MD.C.5B

+2

Standards-aligned

Created by

Eduardo Bernal

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

52 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What does a solenoid valve do?

A. Opens and closes switches

B. Serves as an actuator to open and close pneumatic and hydraulic valves

C. Transforms volts to millivolts

D. Actuates to open and close terminal blocks

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the psi reading on MOST gauge pressure indicators that are at atmospheric pressure?

100

10

0

Below zero

Tags

CCSS.7.RP.A.3

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Proportional control is also known as

Derivative control

Reset control

Gain control

On - off control

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The document that’s required to loop check & commission are

P & ID , loop diagrams , and instrument specification sheets

P & ID and electrical drawings

Electrical drawings and typical installations detail sheets

Logic diagrams , loop sheets , and instrument operation manuals

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

In an Instrument loop, where would wet instrument air show up first?

In the air piping

At the dryer

In the filter regulator

At the valve positioner

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

A list of materials are found in:

General arrangement drawings

Instrument detail drawings

Piping orthographics

P & ID

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Signal cable shields should be connected to ground at:

Each accessible point in the signal path

Each end of the signal path

Each junction point in the signal path

1 point in the signal path

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?