80 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Where do you maintain the length of the project ID key?
Project profile
Special characters
Project type
Project coding mask
2.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
You want to allocate overhead rates to a WBS element.What must you assign to the WBS element?
Costing sheet
Settlement rule
Results analysis key
Overhead key
3.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
In your logistics project, you want to carry out the internal project work as soon as possible.What do you have to maintain in capacity requirements planning?
Capacity planner group in the network header
Scheduling and capacity category
Control key of an activity
Scheduling and distribution key
4.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
You want to use subnetworks during the project.Which of the following is a characteristic of subnetworks?
Maintenance orders can be defined as subnetworks
The scheduling type of a subnetwork is always copied from the superior network.
Subnetworks must be scheduled separately from the superior network.
A subnetwork cannot be defined for a superior subnetwork
5.
MULTIPLE SELECT QUESTION
1 min • 1 pt
A customer needs to analyze the capacity requirements of their network activities.Which reports do you recommend?Note: There are 2 correct answers to this question
Resource reports
Cost element reports
Structure information system reports
Hierarchical reports
6.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
The basic dates of subordinate WBS elements should be extrapolated without taking into account the basic dates of higher-level WBS elements.What planning method for basic dates do you use?
Bottom-up
Top-down
Free planning
Strict bottom-up
7.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
You have assigned a material to a network activity and want to determine the requirement date related to this activity.What set of dates do you have to maintain?
Basic dates of the network activity
Basic dates of the WBS
Actual dates of the network activity
Forecast dates of the WBS
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?