MAINTAINANCE OF PLUMBING SYSTEMS

MAINTAINANCE OF PLUMBING SYSTEMS

Professional Development

6 Qs

quiz-placeholder

Similar activities

HBB CX Team 28 Mar

HBB CX Team 28 Mar

Professional Development

10 Qs

Quiz sobre Comercio Electrónico

Quiz sobre Comercio Electrónico

Professional Development

10 Qs

Metodología de Investigación Cualitativa

Metodología de Investigación Cualitativa

Professional Development

10 Qs

PalFish Grand Openning 🎉😙

PalFish Grand Openning 🎉😙

Professional Development

10 Qs

IPMAS SUL-SEL

IPMAS SUL-SEL

Professional Development

10 Qs

Potensi Kelautan

Potensi Kelautan

Professional Development

10 Qs

SALUD MENTAL

SALUD MENTAL

Professional Development

10 Qs

Show respect for others in public places

Show respect for others in public places

Professional Development

10 Qs

MAINTAINANCE OF PLUMBING SYSTEMS

MAINTAINANCE OF PLUMBING SYSTEMS

Assessment

Quiz

Others

Professional Development

Practice Problem

Easy

Created by

Ngaru Dedan

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

6 questions

Show all answers

1.

OPEN ENDED QUESTION

5 mins • 8 pts

Demonstrate the correct procedure for isolating a water supply before carrying out plumbing maintenance. (8 marks)

Evaluate responses using AI:

OFF

2.

OPEN ENDED QUESTION

10 mins • 10 pts

Using appropriate tools and materials, repair a leaking PVC pipe joint. Describe each step and safety measures taken.

Evaluate responses using AI:

OFF

3.

OPEN ENDED QUESTION

3 mins • 7 pts

Clean and maintain a clogged trap under a sink. Explain the causes of clogging and preventive measures.

Evaluate responses using AI:

OFF

4.

OPEN ENDED QUESTION

3 mins • 8 pts

Perform routine inspection and maintenance on a ball valve in a storage tank. Include diagnosis of faults and corrective actions.

Evaluate responses using AI:

OFF

5.

OPEN ENDED QUESTION

3 mins • 7 pts

Replace a worn-out washer in a compression-type tap. Show all steps, tools used, and reassembly procedure.

Evaluate responses using AI:

OFF

6.

OPEN ENDED QUESTION

3 mins • 10 pts

Test and report on the functionality of a building's drainage system. Include visual inspection, water flow testing, and documentation of faults.

Evaluate responses using AI:

OFF