1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary purpose of Quality Assurance (QA)?

To identify and fix errors in a product.

To ensure the product meets its requirements through a validation process.

To perform functional and compatibility testing.

To manage the overall quality of the development team.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main objective of Quality Control (QC)?

To establish methods that prevent bugs from occurring.

To assure expected quality for the product.

To ensure all necessary procedures and techniques are followed for a defect-free product.

To review project documentation and test cases.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How do Quality Assurance (QA) and Quality Control (QC) differ in their fundamental nature?

QA is a corrective process, while QC is a preventive process.

QA focuses on the entire product, while QC focuses on the verification process.

QA is a preventive process, while QC involves corrective measures.

QA is performed by a dedicated team, while QC involves the entire development team.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary focus of Quality Assurance (QA) compared to Quality Control (QC)?

QA focuses on the entire product, while QC focuses on the quality of the verification process.

QA focuses on the quality of the verification process, while QC focuses on the entire product.

QA focuses on identifying defects, while QC focuses on preventing them.

QA focuses on product requirements, while QC focuses on team skills.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following activities is typically associated with Quality Assurance (QA)?

Functional testing.

Test automation.

Document review.

Compatibility testing.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following activities is typically associated with Quality Control (QC)?

Walkthrough.

Inspection.

Test cases review.

Integration testing.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who is primarily responsible for performing Quality Assurance (QA) activities?

A dedicated team skilled in testing.

Everybody in the development team.

External auditors only.

Project managers exclusively.

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How does the time consumption of Quality Assurance (QA) compare to Quality Control (QC)?

QA consumes more time than QC.

QC consumes less time than QA.

QA consumes less time, while QC is an extensive process.

Both QA and QC consume an equal amount of time.