What does the term "setting out" refer to in construction?

Removing topsoil
Marking and positioning a building
Transferring levels on a site
Clearing vegetation

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which tool is commonly used to check right angles during setting out?

Laser level
Builder’s square
Spirit level
Optical level

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the typical thickness of topsoil removed during site clearance?

50 mm
100 mm
150 mm
200 mm

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What does the acronym "OSBM" stand for in construction?

On-Site Benchmark
Ordnance Survey Benchmark
Official Site Boundary Mark
Original Survey Base Map

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the following tools is used for transferring levels with modern technology?

Dumpy level
Spirit level
Rotating laser level
Straight edge

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is a temporary benchmark typically made from?

Steel or timber
Concrete or brick
Aluminium or plastic
Stone or clay

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the main purpose of profiles during setting out?

To hold ranging lines in place
To measure levels
To check for underground services
To remove topsoil

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?