Gas pipework knowledge check 1 (powerpoint 1-4)

Gas pipework knowledge check 1 (powerpoint 1-4)

Professional Development

20 Qs

quiz-placeholder

Similar activities

MA0568 revision

MA0568 revision

Professional Development

20 Qs

GMJ 6035 showers work sheet

GMJ 6035 showers work sheet

Professional Development

18 Qs

Nat'l Plumbing Code Q4

Nat'l Plumbing Code Q4

University - Professional Development

25 Qs

PASTRIES

PASTRIES

1st Grade - Professional Development

15 Qs

GMJ 9189 Phase 1 Unit 309

GMJ 9189 Phase 1 Unit 309

Professional Development

21 Qs

GMJ 6035 electrical quiz. Again.

GMJ 6035 electrical quiz. Again.

Professional Development

21 Qs

Common Plumbing Processes 6035-02 | Quiz 2

Common Plumbing Processes 6035-02 | Quiz 2

Professional Development

17 Qs

Knowledge Check 2- PLUMBING 101

Knowledge Check 2- PLUMBING 101

Professional Development

16 Qs

Gas pipework knowledge check 1 (powerpoint 1-4)

Gas pipework knowledge check 1 (powerpoint 1-4)

Assessment

Quiz

Other

Professional Development

Medium

Created by

Mike Dawson

Used 1+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which regulation states that gas operatives must not damage the building fabric when installing pipework?

Regulation 18

Regulation 20

Regulation 22

Regulation 35

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of conducting a tightness test before installation?

To check for water leaks

To ensure the pipework is clean

To confirm the system is sound and leak-free

To verify the pipe diameter

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What tool is recommended to detect stray electrical currents in gas pipework?

Multimeter

Clamp meter

Non-contact single pole voltage detector

Continuity tester

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why should drawings be consulted before installation?

To estimate the cost

To locate areas subject to dampness or mechanical damage

To determine the color of the pipe

To check the weather forecast

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What must be used to maintain electrical continuity when removing a gas pipe section?

Plastic push-fit fitting

Temporary bonding equipment

Isolation valve

Dust cap

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the correct action when leaving open-ended gas pipework unattended?

Leave it open if the valve is shut

Plug or cap it with an appropriate fitting

Cover it with tape

Mark it with a warning sign

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT permitted on gas installations?

Compression fittings

Capillary fittings

Plastic push-fit fittings

Press-fit fittings

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?