1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A commercial and industrial conditioned air system using water as the heat transfer medium will require a _________________________________.

Hot water boiler and hot water pump

Water chiller and chilled water pump

Hot water boiler, water chiller, and hot and chilled water pumps

Hot water and chilled water pumps

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Commercial and industrial packaged units are commonly installed ___________________.

Inside the structure

On the roof

On the ground

On the wall

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Commercial condensing units with multiple condenser fans will often cycle some of the fans off during cool ambient temperatures to maintain a condensing temperature at or around _________________.

50ºF

75ºF

90ºF

120ºF

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Compressor capacity control that involves making cylinders inactive by controlling the valves using solenoids is an example of _____________________.

Cylinder unloading

Valve lifting

Speed variation

Modular compression

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How long will the average anti-short-cycling time delay will cause the unit to delay before restarting?

Two minutes

Five minutes

Ten minutes

One hour

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What circulates the hot water in hot water heating system?

Hot water boiler

Hot water coil

Hot water pump

Hot water zone controller

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of an interlock in a control system?

To start the compressor and condenser fan motor at same time

To make certain that the condenser fan motor and water-cooled condenser are operating

To make certain that a major load does not attempt to operate without a necessary load operating

To make certain that the indoor blower is not operating without compressor operation

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?