First and Second Fix in Carpentry

First and Second Fix in Carpentry

Vocational training

10 Qs

quiz-placeholder

Similar activities

Plumbing Processes and Techniques

Plumbing Processes and Techniques

12th Grade

11 Qs

4. Level 1 Joinery Unit 101 - Foundations

4. Level 1 Joinery Unit 101 - Foundations

12th Grade

15 Qs

212 ppt3 Site preparation Quiz

212 ppt3 Site preparation Quiz

12th Grade

15 Qs

Health & Safety

Health & Safety

11th - 12th Grade

10 Qs

First Fix Carpentry Quiz

First Fix Carpentry Quiz

12th Grade

15 Qs

Chippies Level 2

Chippies Level 2

KG - University

10 Qs

Drywall Installation Quiz

Drywall Installation Quiz

KG - University

8 Qs

5. Level 1 Joinery Unit 101 - Flat roofs

5. Level 1 Joinery Unit 101 - Flat roofs

12th Grade

15 Qs

First and Second Fix in Carpentry

First and Second Fix in Carpentry

Assessment

Quiz

Construction

Vocational training

Hard

Created by

Cedric Cotilleau

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is meant by 'first fix' in carpentry and joinery?

The installation of final decorative features such as skirting boards and architraves

The initial phase of construction where structural elements like stud walls, door frames, and floor joists are installed

The process of painting and finishing woodwork

The installation of kitchen units and appliances

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is typically included in the first fix stage?

Hanging doors

Installing skirting boards

Fitting floor joists and stud partition walls

Painting woodwork

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main focus of quality control in carpentry?

Ensuring all work is completed as quickly as possible

Ensuring all work meets specified standards and is free from defects

Using the cheapest materials available

Allowing for as many design changes as possible

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following best describes 'second fix' in construction?

The installation of structural timber elements

The phase where finishing components such as doors, skirting, and architraves are fitted

The process of laying foundations

The installation of roof trusses

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT typically part of the first fix stage?

Installing floor joists

Fitting door linings

Hanging doors

Constructing stud walls

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

At what stage are electrical cables and plumbing pipes usually installed in a building?

First fix

Second fix

After painting

During landscaping

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a key stage in the second fix process?

Installing roof trusses

Fitting skirting boards and architraves

Building stud partition walls

Laying foundations

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?