Communication in construction Week 1

Communication in construction Week 1

Vocational training

10 Qs

quiz-placeholder

Similar activities

Plumbing Knowledge Quiz

Plumbing Knowledge Quiz

12th Grade

10 Qs

MTL1 H&S Learner Outcome 1

MTL1 H&S Learner Outcome 1

11th Grade - University

13 Qs

 Drainage - Soil Stack, Gullys, Manholes, Roddings

Drainage - Soil Stack, Gullys, Manholes, Roddings

11th Grade - University

14 Qs

Cavity Wall Construction Quiz

Cavity Wall Construction Quiz

KG - University

11 Qs

Practice Exam

Practice Exam

9th Grade

10 Qs

phase 1 new

phase 1 new

KG - University

12 Qs

Orientation to Carpentry

Orientation to Carpentry

9th Grade

15 Qs

Con Built Environ PPT 7 Quiz

Con Built Environ PPT 7 Quiz

KG - University

15 Qs

Communication in construction Week 1

Communication in construction Week 1

Assessment

Quiz

Construction

Vocational training

Hard

Created by

Tiff Foley

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A variation order can be signed by which one of the following?

Clerk of works

Structural surveyor

Quantity surveyor

Procurement officer

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What regulations would the local water authority inspector be concerned about?

Building regulations Part A

The Water Supply and Water fittings Regulations 1999

Manufactures instructions

Building regulations Part L1

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who's job onsite would it be to source the materials needed to complete a project by obtaining quotes from suppliers for materials, getting delivery times and quality assurance of materials?

Estimator

Quantity surveyor

Procurement officer

Clerk of works

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who's job is it onsite to calculate loads, forces and variances from wind and rain, looking at the building fabric?

Clerk of works

Architect

Building contractor

Structural engineer

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does a building services engineer do?

Calculate the amount of labour and materials required to complete the project and then collate these in a bill of quantities.

Design the internal services within the building which be cost effective, environmentally friendly and with good maintenance access.

The designer of the project and considered the leader of the management team.

Enters into the contract with the client to carry out the work in accordance with the drawings, bill of quantities and specification.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who is onsite and runs the day-to-day running of the site including budgets, hiring, deliveries and construction duties?

Procurement officer

Building services engineer

Site supervisor

Quantity surveyor

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who would come onto site and ensure that build complies with Building regulations L1A?

Health and Safety inspector

Building control officer

Water inspector

Electrical services inspector

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?