D62 QUIZ OF THE DAY

D62 QUIZ OF THE DAY

Professional Development

32 Qs

quiz-placeholder

Similar activities

Real Estate Part I

Real Estate Part I

Professional Development

37 Qs

Utah Testing Ethics 2022-2023

Utah Testing Ethics 2022-2023

Professional Development

36 Qs

D60 FACE THE CHALLENGE

D60 FACE THE CHALLENGE

Professional Development

33 Qs

Drainage Systems 6035-02 | Part 4

Drainage Systems 6035-02 | Part 4

Professional Development

36 Qs

AGR DAY 1 QUIZ (TECHNICAL) UPDATED

AGR DAY 1 QUIZ (TECHNICAL) UPDATED

Professional Development

30 Qs

anti pollution

anti pollution

Professional Development

27 Qs

D63 CHECK YOUR LEVEL

D63 CHECK YOUR LEVEL

Professional Development

29 Qs

MACHINE TROUBLESHOOTING D155A-6

MACHINE TROUBLESHOOTING D155A-6

Professional Development

35 Qs

D62 QUIZ OF THE DAY

D62 QUIZ OF THE DAY

Assessment

Quiz

Professional Development

Professional Development

Hard

Created by

WINCENTRE CLASSES

FREE Resource

AI

Enhance your content

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

32 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

In sewer line setting out, the work begins from which end?
Midpoint
Highest point
Outfall end
Starting end

Answer explanation

Sewer setting out starts from the outfall end toward the starting end.

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which instrument is used to check alignment and gradient during sewer trench excavation?
Boning rod and sight rails
Level and staff
Ranging rod
Compass

Answer explanation

Sight rails and boning rods help in maintaining proper alignment and gradient.

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

In water test of sewers, what is the maintained pressure depth?
0.5–1.0 m
1.0–1.5 m
1.5–2.0 m
2.0–2.5 m

Answer explanation

Water test is done by maintaining 1.0 to 1.5 m depth of water between manholes.

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What does the mirror test indicate in sewer line testing?
Leakage
Obstruction
Straightness
Air lock

Answer explanation

A full light circle in a mirror test indicates the sewer line is straight.

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the correct direction for socket ends during sewer laying?
Facing upstream
Facing downstream
Any direction
Perpendicular to flow

Answer explanation

Pipes are laid with socket ends facing upstream to resist backflow pressure.

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

In air test, what pressure is maintained for testing large diameter pipes?
25 mm
50 mm
75 mm
100 mm

Answer explanation

Air test maintains 75 mm pressure; a drop of more than 25 mm indicates leakage.

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which gas turns lead acetate paper black in sewer gas tests?
CO₂
H₂S
CH₄
O₂

Answer explanation

Hydrogen sulfide (H₂S) turns lead acetate paper black, indicating its presence.

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?

Discover more resources for Professional Development