SETTING OUT

SETTING OUT

University

20 Qs

quiz-placeholder

Similar activities

Critical Activities Identification Worksheet

Critical Activities Identification Worksheet

University

20 Qs

Week 5 quiz CC & P

Week 5 quiz CC & P

University

16 Qs

Understanding Earthing Arrangements

Understanding Earthing Arrangements

12th Grade - University

20 Qs

The Owl Project

The Owl Project

8th Grade - University

15 Qs

Hot Water Systems RECAP

Hot Water Systems RECAP

12th Grade - University

15 Qs

Construction Waste Management Quiz

Construction Waste Management Quiz

12th Grade - University

15 Qs

Maintenance 210

Maintenance 210

12th Grade - University

16 Qs

Tutorial 1

Tutorial 1

University

15 Qs

SETTING OUT

SETTING OUT

Assessment

Quiz

Construction

University

Medium

Created by

Nur Roslee

Used 2+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in building setting out procedure?

Install profile boards

Establish the frontage line and mark it on site

Dig trenches

Set column layout

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does the frontage line represent?

Road curb or center line reference

The back wall position

The height of building

Roof slope indicator

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is done after establishing the base line?

Paint the floor

Install steel bars

Mark and check the main building lines

Erect scaffolding

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

  1. Which tool is used to mark building corners on the ground?

Paint

Stout Peg

Rope

Concrete Post

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which equipment is used to measure long distances on site?

Ruler

Steel measuring tape

Folding Meter

Measuring Tape

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

  1. What is the purpose of diagonal check during setting out?

To set column height

To align the roof slope

To ensure corners are at right angles

To confirm wall thickness

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

After all angles and lengths are confirmed, what is the final step?

Lay bricks

Set up profile boards at each building corner

Install electrical wiring

Pour foundation

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?