1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in building setting out procedure?

Install profile boards

Establish the frontage line and mark it on site

Dig trenches

Set column layout

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does the frontage line represent?

Road curb or center line reference

The back wall position

The height of building

Roof slope indicator

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is done after establishing the base line?

Paint the floor

Install steel bars

Mark and check the main building lines

Erect scaffolding

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

  1. Which tool is used to mark building corners on the ground?

Paint

Stout Peg

Rope

Concrete Post

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which equipment is used to measure long distances on site?

Ruler

Steel measuring tape

Folding Meter

Measuring Tape

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

  1. What is the purpose of diagonal check during setting out?

To set column height

To align the roof slope

To ensure corners are at right angles

To confirm wall thickness

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

After all angles and lengths are confirmed, what is the final step?

Lay bricks

Set up profile boards at each building corner

Install electrical wiring

Pour foundation

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?