D64 MASTER THE DAY

D64 MASTER THE DAY

Professional Development

105 Qs

quiz-placeholder

Similar activities

LATIHAN SOAL PEDAGOGIK BY RISKA LISMAYANTI

LATIHAN SOAL PEDAGOGIK BY RISKA LISMAYANTI

Professional Development

100 Qs

2021 Practice Test #6

2021 Practice Test #6

Professional Development

100 Qs

D67 MASTER THE DAY

D67 MASTER THE DAY

Professional Development

103 Qs

D66 MASTER THE DAY

D66 MASTER THE DAY

Professional Development

104 Qs

D54 MASTER THE DAY

D54 MASTER THE DAY

Professional Development

110 Qs

FRIDAY WEEKLY EXAM (27/06/2025)

FRIDAY WEEKLY EXAM (27/06/2025)

Professional Development

100 Qs

DSL-202 Engines 2 FINAL

DSL-202 Engines 2 FINAL

Professional Development

100 Qs

ACR-203 Baseline

ACR-203 Baseline

Professional Development

100 Qs

D64 MASTER THE DAY

D64 MASTER THE DAY

Assessment

Quiz

Professional Development

Professional Development

Hard

Created by

WINCENTRE CLASSES

FREE Resource

105 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which formwork material is experimental and used for complex shapes using geotextile sheets?
Fabric formwork
Plastic formwork
Steel formwork
Plywood formwork

Answer explanation

Fabric formwork using geotextile sheets is experimental and suited for complex shapes.

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the main function of bracing in formwork?
Hold sides together
Prevent movement
Shape concrete
Support vertical load

Answer explanation

Bracing provides diagonal support to prevent movement of formwork.

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which type of reinforcement may be used without end anchorage if development length is satisfied?
Plain bars
Deformed bars
TMT bars
Structural steel bars

Answer explanation

Deformed bars can be used without end anchorage if development length requirements are met.

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The clean-out hole at the bottom of column formwork is provided for:
Ventilation
Removing debris
Pouring concrete
Fixing reinforcement

Answer explanation

A clean-out hole at the bottom of column formwork allows removal of debris before concreting.

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

For slabs spanning up to 4.5m, props are removed after:
3 days
7 days
14 days
21 days

Answer explanation

Props to slabs spanning up to 4.5m are removed after 7 days.

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

In reinforced masonry columns, steel plates are generally of what thickness?
4 mm
5 mm
6 mm
8 mm

Answer explanation

Steel plates of about 6 mm thickness are provided at intervals in reinforced masonry columns.

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which type of slab system consists of bricks laid flat in multiple courses with steel bars in between?
Jack arch slab
RBC slab
Hollow-tile slab
Solid slab

Answer explanation

RBC slab has bricks laid flat in two or more courses with steel bars in between, grouted with mortar.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?