MEMATUHI KERJA-KERJA DENGAN PERATURAN ELEKTRIK VOLTAN RENDAH

MEMATUHI KERJA-KERJA DENGAN PERATURAN ELEKTRIK VOLTAN RENDAH

University

15 Qs

quiz-placeholder

Similar activities

ELECTRO QUIZZER R3

ELECTRO QUIZZER R3

University

10 Qs

A7-B2 maintenance Assessment

A7-B2 maintenance Assessment

University

10 Qs

19EET402 - Generation, Transmission and Distribution

19EET402 - Generation, Transmission and Distribution

University

20 Qs

Transistor as Amplifier

Transistor as Amplifier

University

20 Qs

Synchronous Machine

Synchronous Machine

University

11 Qs

PE Unit 2

PE Unit 2

University

20 Qs

Substations Quiz

Substations Quiz

University

14 Qs

Electrical Quiz

Electrical Quiz

University

10 Qs

MEMATUHI KERJA-KERJA DENGAN PERATURAN ELEKTRIK VOLTAN RENDAH

MEMATUHI KERJA-KERJA DENGAN PERATURAN ELEKTRIK VOLTAN RENDAH

Assessment

Quiz

Education

University

Hard

Created by

SAhare Zuan

Used 1+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the most critical step before performing a shutdown work on a high voltage substation?

Close the substation fence

Hang a warning notice

Ground the isolated conductor

Measure the load current with a multimeter

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When shutdown work is performed, the NSL and SL padlock keys are used to:

Prevent the public from entering the substation

Lock the gate door for safety

Lock the switch so it cannot be turned on again

Determine the phase direction of the line

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What voltage reading proves that the circuit is completely safe to touch after shutdown?

Between phases = 415V, phase-neutral = 230V

Between phases = 0V, phase-neutral = 0V

Between phases = 11kV, phase-neutral = 6.6kV

Between phases = 1000V, phase-neutral = 600V

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why can live line work only be performed by workers with special certification?

To reduce maintenance costs

Because they have been trained with special techniques & PPE

So that work can be completed faster

To avoid the use of testing equipment

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main function of the HRC fuse in the LV distribution board?

Stabilize voltage at the transformer

Determine load balance between phases

Protect the final circuit from overload & short circuit

Control the power factor rate of the load

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first action when needing to climb a wooden pole for overhead line work?

Ensure the pole is not leaning

Check for wood rot before climbing

Hang a safety rope first

Test voltage using a phasing stick

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why should line work not be carried out during bad weather?

Difficult to obtain testing readings

Can reduce the stability of the wooden pole

Risk of shock & lightning increases

Cannot hang warning signs clearly

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?